2015
DOI: 10.1080/09537287.2014.971534
|View full text |Cite
|
Sign up to set email alerts
|

A structured procedure for materials planning during production transfer

Abstract: This paper explores materials planning procedures to ensure the materials' availability during production transfers. The paper defines a production transfer as the preparation, physical transfer and start-up of relocated production. A structured procedure of materials planning during production transfer is developed based on theory, and then validated and refined based on the analysis of four case studies. The paper shows that there is a need for a structured procedure of materials planning during production t… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

3
49
0

Year Published

2016
2016
2020
2020

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 11 publications
(52 citation statements)
references
References 28 publications
3
49
0
Order By: Relevance
“…Flexibility R19. The possibility to reserve resources at sender for necessary tasks during transfer execution and start-up at receiver [16,19] R20. The possibility to plan the transfer as a gradual transfer, volumes being only gradually decreased as outputs at receiver are increased [16,19] II.…”
Section: Imentioning
confidence: 99%
“…Flexibility R19. The possibility to reserve resources at sender for necessary tasks during transfer execution and start-up at receiver [16,19] R20. The possibility to plan the transfer as a gradual transfer, volumes being only gradually decreased as outputs at receiver are increased [16,19] II.…”
Section: Imentioning
confidence: 99%
“…The third phase, production transfer, concerns the actual relocation of manufacturing of products or components between two production facilities. It consists of three distinct stages: Transfer preparation; physical transfer, and; production start-up [10]. The final phase is the steady state.…”
Section: Outsourcing Of Productionmentioning
confidence: 99%
“…The final phase is the steady state. Here, the supplier has reached a full-scale and stable production, at targeted levels of cost and quality [10].…”
Section: Outsourcing Of Productionmentioning
confidence: 99%
“…A22.Perform Transfer Risk Assessment. Implement measures [17]. A23.Problem solving upgrading recalibration test of production system [7,14].…”
Section: Production Transfermentioning
confidence: 99%
“…A42. Decide when to transfer responsibility to order raw material to Receiver [17]. A43.Adapt processes to a new environment [22].…”
Section: Production Transfermentioning
confidence: 99%