2001
DOI: 10.1016/s0301-4215(01)00003-9
|View full text |Cite
|
Sign up to set email alerts
|

A study of productivity in the Indian coal sector

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
5
0

Year Published

2006
2006
2024
2024

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 13 publications
(5 citation statements)
references
References 14 publications
0
5
0
Order By: Relevance
“…The study of Kulshreshtha and Parikh [5] was an attempt that has been made to do an in-depth analysis of the productivity growth in the Indian coal sector during the period 1980-1992. Total factor productivity was calculated from the output and input indices for Coal India Ltd.…”
Section: Literature Reviewmentioning
confidence: 99%
“…The study of Kulshreshtha and Parikh [5] was an attempt that has been made to do an in-depth analysis of the productivity growth in the Indian coal sector during the period 1980-1992. Total factor productivity was calculated from the output and input indices for Coal India Ltd.…”
Section: Literature Reviewmentioning
confidence: 99%
“…A general equation based on man-hours is defined for the other factors in which labour productivity plays an important role. 1 This equation provides the results of labour productivity according to the units responsible for labour utilisation and is given below where (1) or Q/L R ; output/total man-hours (2) or Q/L S ; standard productivity (output/standard man-hours), which is a parameter of production management and under the management's responsibility (3) or LS/LE; labour productivity which reflects labour contribution to the productivity (4) or L E /L R9 ; effective man-hours/man-hours input, which is under front-line supervisor (5) or L R9 /L R ; man-hours input/total man-hours input (6) or L S /L R9 ; process productivity, which shows the efficiency of labour resource utilisation in the front-line operations (7) or L E /L R ; effective man-hours/total man-hours input (8) or L S /L R ; total process productivity, which will be developed by the WPMR system for final and total process productivity. In this equation:…”
Section: Workhop Productivity Management By Ratios -Wpmr Systemmentioning
confidence: 99%
“…8 Productivity management is also a fundamental activity in business management. 7,[9][10][11] Thus, the other related controlling activities are centred on productivity management. The Labour Productivity Management by Ratio (WPMR) system is a typical framework in productivity management in terms of labour resources.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…There are three approaches for measuring the improvement in productivity: index number approach, parametric approach and nonparametric approach (Mongia and Sathaye, 1998;Hailu and Veeman, 2001). The studies conducted in mining sector on productivity have generally been applied in coal mining (Szwilski, 1988;Darmstadter, 1997;Flynn, 2000;Kulshreshtha and Parikh, 2001) due to the fact that data can be collected more easily in this sector. However, there seems to be no productivity measurement study on the boron sector according to the researches of present authors.…”
Section: Introductionmentioning
confidence: 99%