2008 International Conference on Information Security and Assurance (Isa 2008) 2008
DOI: 10.1109/isa.2008.28
|View full text |Cite
|
Sign up to set email alerts
|

A Study on the Compound Communication Network over the High Voltage Power Line for Distribution Automation System

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2010
2010
2023
2023

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 7 publications
(3 citation statements)
references
References 1 publication
0
3
0
Order By: Relevance
“…At present, there are some studies about information transmission in DA, which mainly focus on the design of the distribution automation information security scheme [22], information security assessment [23], detection [24] and information communication [25,26]. Considering the massive integration of components in the power distribution system [27], the surge in heterogeneous data from multiple sources [28], and the diverse and ecological requirements of electricity business applications [29], a type of cloud-edge collaborative data transmission and computing technology based on RTUs has emerged [30].…”
Section: Pmsmentioning
confidence: 99%
See 1 more Smart Citation
“…At present, there are some studies about information transmission in DA, which mainly focus on the design of the distribution automation information security scheme [22], information security assessment [23], detection [24] and information communication [25,26]. Considering the massive integration of components in the power distribution system [27], the surge in heterogeneous data from multiple sources [28], and the diverse and ecological requirements of electricity business applications [29], a type of cloud-edge collaborative data transmission and computing technology based on RTUs has emerged [30].…”
Section: Pmsmentioning
confidence: 99%
“…The time to correct the remote measurement information and re-judge the failure type is t 1 22 . The time of the failure location phase is as follows:…”
Section: Bmentioning
confidence: 99%
“…Next steps for this project is to raise the applicable voltage to 138 kV and also extend repeater spacing. Other international activities involving PLC over HV lines can be found in [96], [97], [98].…”
Section: A Plc For High Voltage Networkmentioning
confidence: 99%