2012
DOI: 10.5516/net.02.2012.708
|View full text |Cite
|
Sign up to set email alerts
|

A SUMMARY OF 50thOECD/NEA/CSNI INTERNATIONAL STANDARD PROBLEM EXERCISE (ISP-50)

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2014
2014
2024
2024

Publication Types

Select...
6
1
1

Relationship

3
5

Authors

Journals

citations
Cited by 13 publications
(3 citation statements)
references
References 6 publications
0
3
0
Order By: Relevance
“…Recently, similar effort has continued by D'auria's research group to consolidate qualified database (both experimental and code calculation results) through standardization, aiming to support the V&V activities of system codes and uncertainty methodologies [36]. In addition, new experimental data and thus new insight/safety issues have been continuously revealed [37,38] all of which are obviously precious to demonstrate and improve the nuclear system code capability. Note that many of these efforts are mainly to support the "independent" code assessment after completing the code development phase (section 3).…”
Section: Existing Vandv Effort For Nuclear System Safety Analysis Codesmentioning
confidence: 99%
“…Recently, similar effort has continued by D'auria's research group to consolidate qualified database (both experimental and code calculation results) through standardization, aiming to support the V&V activities of system codes and uncertainty methodologies [36]. In addition, new experimental data and thus new insight/safety issues have been continuously revealed [37,38] all of which are obviously precious to demonstrate and improve the nuclear system code capability. Note that many of these efforts are mainly to support the "independent" code assessment after completing the code development phase (section 3).…”
Section: Existing Vandv Effort For Nuclear System Safety Analysis Codesmentioning
confidence: 99%
“…These activity results were described in references [1][2][3]. International benchmarking activities using ATLAS were also performed for various scenarios by international joint projects, which are the 50th OECD/NEA/CSN international standard problem [4], OECD/NEA-ATLAS project [5], and OECD/NEA-ATLAS2 project [6].…”
Section: Introductionmentioning
confidence: 99%
“…[4][5][6] Afterward, a series of DVI line break tests 7) were performed by varying the break size from 5 to 100% and, subsequently, a series of cold-leg break tests 8) were performed to include sensitivity tests on the break size, break location, and the emergency core cooling water injection configuration. These SBLOCA tests were performed to investigate the performance of the DVI method for ECC water delivery adopted for the APR1400 with the ATLAS.…”
Section: Introductionmentioning
confidence: 99%