A Survey on Integration of Optimization and Project Management Tools for Sustainable Construction Scheduling

Abstract: Construction scheduling, in practice, commonly relies on the usage of commercial project management tools (PMT) without specific optimization features. To obtain optimal schedules, planners often need to develop separate optimization models with special tools, which, however, demand further processing and editing of optimization results by PMT into forms expected for project management. In this regard, separation of optimization and PMT also requires considerable additional work for complete and harmonized upd… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
22
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
5
3

Relationship

0
8

Authors

Journals

citations
Cited by 50 publications
(22 citation statements)
references
References 50 publications
0
22
0
Order By: Relevance
“…Sustainable realization of the construction process of a building object is largely related to properly developed and realized schedules and planning/selection of working methods (technologies, organisational methods). Sustainable schedules are not only about delivering results according to objectives (cost, time or resource consumption), but also include decisions that should be sustainable in the long term [2,3]. This is all the more difficult since the implementation of construction projects is a complex issue and is exposed to numerous risk factors, such as: dependence on the influence of weather conditions, individual nature of each construction site, real estate of construction products (during construction realization resources are transferred to the subsequent work stations as compared to an industrial plant, where the processed product is moved to subsequent workstations), significant scattering of structures in the field (scattering of objects in the field makes it difficult to organize works and increases the scope of transport works), late achievement of effects resulting from the construction of objects, significant dimensions and large mass of elements and construction objects, long period of use of construction objects, random nature of construction process realization time, internal and external supply problems, failure of machinery and equipment used [4][5][6][7][8].…”
Section: The Research Focusmentioning
confidence: 99%
See 1 more Smart Citation
“…Sustainable realization of the construction process of a building object is largely related to properly developed and realized schedules and planning/selection of working methods (technologies, organisational methods). Sustainable schedules are not only about delivering results according to objectives (cost, time or resource consumption), but also include decisions that should be sustainable in the long term [2,3]. This is all the more difficult since the implementation of construction projects is a complex issue and is exposed to numerous risk factors, such as: dependence on the influence of weather conditions, individual nature of each construction site, real estate of construction products (during construction realization resources are transferred to the subsequent work stations as compared to an industrial plant, where the processed product is moved to subsequent workstations), significant scattering of structures in the field (scattering of objects in the field makes it difficult to organize works and increases the scope of transport works), late achievement of effects resulting from the construction of objects, significant dimensions and large mass of elements and construction objects, long period of use of construction objects, random nature of construction process realization time, internal and external supply problems, failure of machinery and equipment used [4][5][6][7][8].…”
Section: The Research Focusmentioning
confidence: 99%
“…[1] as well as being a large labour market; it involves significant human resources. Sustainable development refers to the whole life cycle of a building from siting to design, construction, operation, maintenance, renovation and deconstruction [2].…”
Section: Introductionmentioning
confidence: 99%
“…The proposed implementation methods turned out to be more effective and flexible than the methods of mathematical programming usually applied to such problems [5,9,18]. This concerned both the hybrid approach (Section 4.1) and the dedicated genetic algorithm (Section 4.2) developed by the authors.…”
Section: Literature Reviewmentioning
confidence: 99%
“…For question Q 2 , the objective function ( 9) determines the minimum number of new competences that the employees must accomplish. For other questions, the objective function may have a slightly different form than (9).…”
Section: Mathematical Model Of the Employee Competence Configuration Problemmentioning
confidence: 99%
“…Current practices in the domain of construction planning and scheduling are oriented towards automatic schedule development and the application of specialized optimization techniques [15]. Although modern technologies such as BIM have already been applied to the optimization problems in the realm of construction scheduling [16][17][18][19][20][21], additional development and possible extensions are still needed to effectively automatize scheduling practices and improve both customizability and user-friendliness of emerging technologies for practical use [22,23].…”
Section: Introductionmentioning
confidence: 99%