2017
DOI: 10.1016/j.proeng.2017.08.054
|View full text |Cite
|
Sign up to set email alerts
|

A Survey Study on Industrial Construction Project Supply Chain: On Time Performance and Practices of Structural Steel and Pipe Spools

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
1
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
4
1
1

Relationship

0
6

Authors

Journals

citations
Cited by 8 publications
(1 citation statement)
references
References 15 publications
0
1
0
Order By: Relevance
“…It aims to achieve several improvements within the sector, such as higher productivity levels and better quality construction products. Reports and case studies from different parts of the world have shown that prefabrication and on-site assembly are becoming common practices (Wang & Hubbard, 2017). The main reason for delay the completion of construction projects was due to the poor practice of contractors (Sambasivan & Soon, 2007).…”
mentioning
confidence: 99%
“…It aims to achieve several improvements within the sector, such as higher productivity levels and better quality construction products. Reports and case studies from different parts of the world have shown that prefabrication and on-site assembly are becoming common practices (Wang & Hubbard, 2017). The main reason for delay the completion of construction projects was due to the poor practice of contractors (Sambasivan & Soon, 2007).…”
mentioning
confidence: 99%