2016 IEEE PES Innovative Smart Grid Technologies Conference Europe (ISGT-Europe) 2016
DOI: 10.1109/isgteurope.2016.7856303
|View full text |Cite
|
Sign up to set email alerts
|

A traffic light system for enhancing the utilization of demand response in LV distribution networks

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2

Citation Types

0
4
0

Year Published

2018
2018
2020
2020

Publication Types

Select...
3
1

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(4 citation statements)
references
References 4 publications
0
4
0
Order By: Relevance
“…The 'traffic light' concept has been discussed in several other works including: [5] where DSO-TSO cooperation in each system state (green/amber/red) is considered but not demonstrated; [23] and [24] where implementations are outlined without any test case demonstrations; [25] and [26] where implementations are demonstrated at LV but with limited consideration of DSO-TSO interaction.…”
Section: Traffic Light Conceptmentioning
confidence: 99%
“…The 'traffic light' concept has been discussed in several other works including: [5] where DSO-TSO cooperation in each system state (green/amber/red) is considered but not demonstrated; [23] and [24] where implementations are outlined without any test case demonstrations; [25] and [26] where implementations are demonstrated at LV but with limited consideration of DSO-TSO interaction.…”
Section: Traffic Light Conceptmentioning
confidence: 99%
“…The concept used in our simulations is the advanced TLS developed in Project INCREASE where the DSO checks the feasibility of the aggregator's proposed DR unit schedule 15 min ahead of the power delivery using a power flow algorithm (INCREASE FP7 project, 2015;Medved, Prisaln, Zupan ci c, & Gubina, 2016). If the power flow results indicate no network limit violations, the DR schedule is accepted.…”
Section: Traffic Light Systemmentioning
confidence: 99%
“…The authors of Deutsch et al (2014), Medved et al (2016) propose an implementation of the yellow state based on forecasts. In case of a predicted power quality problem, the market mechanisms are used to buy flexibility for this time window.…”
Section: Grid Constraints Versus Energy Marketsmentioning
confidence: 99%
“…In case of a predicted power quality problem, the market mechanisms are used to buy flexibility for this time window. An updated version of the traffic light concept is introduced in Medved et al (2016) which may be used by the DSO to control Demand Response (DR) units. The proposed approach depends on information from power flow calculation based on the joint load schedule of DR units and the residual loads.…”
Section: Grid Constraints Versus Energy Marketsmentioning
confidence: 99%