2022
DOI: 10.1016/j.nima.2021.166058
|View full text |Cite
|
Sign up to set email alerts
|

A Trigger Interface Board for the Large and Medium Sized telescopes of the Cherenkov Telescope Array

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
7
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
3
2

Relationship

1
4

Authors

Journals

citations
Cited by 5 publications
(7 citation statements)
references
References 23 publications
0
7
0
Order By: Relevance
“…In the case of the ASTRI Mini-Array, no analog array stereo trigger (see, for example, [23]) will be implemented at the site. All the events generated by a single telescope will be transferred to and stored at the ASTRI Mini-Array data center in Rome, and the search for Cherenkov events detected in coincidence by more than one telescope will be performed offline as the initial step of the data processing chain.…”
Section: Stereo Event Buildermentioning
confidence: 99%
“…In the case of the ASTRI Mini-Array, no analog array stereo trigger (see, for example, [23]) will be implemented at the site. All the events generated by a single telescope will be transferred to and stored at the ASTRI Mini-Array data center in Rome, and the search for Cherenkov events detected in coincidence by more than one telescope will be performed offline as the initial step of the data processing chain.…”
Section: Stereo Event Buildermentioning
confidence: 99%
“…The L1 signals of each DTB (265 in total) are delivered to an L2-crate (L2C) where they are combined in an OR operation to generate the L2 trigger, i.e., the camera trigger, which is then sent to the trigger interface board (TIB) [11]. Depending on the configuration parameters and camera status, the TIB ignores the L2 or delivers it back as a L1 accepted (L1A) signal all the way back to the FEBs.…”
Section: Camera Triggermentioning
confidence: 99%
“…The laser source is a pulsed diode 11 (50 ps width) creating a uniform illumination of the full camera at a wavelength of 373 nm. The laser is also connected to a UCTS board that records the timestamp of the photon through a TiCkS board, allowing to perform precise measurements of the camera timing performances.…”
Section: Camera Test Setupmentioning
confidence: 99%

The NectarCAM Timing System

Bradascio,
Rueda,
Barrio
et al. 2023
Preprint
“…This reconfigured system was then deployed in the MAGIC CH. On the LST-1 side, no further changes are necessary, as the telescope camera, equipped with a Trigger Interface board (TIB) [7], is ready to receive L1 trigger signals from neighboring telescopes.…”
Section: Implementation Of the Hardware Stereo Trigger Systemmentioning
confidence: 99%