2017
DOI: 10.1016/j.cie.2017.02.010
|View full text |Cite
|
Sign up to set email alerts
|

A two-level method of production planning and scheduling for bi-objective reentrant hybrid flow shops

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
12
0

Year Published

2017
2017
2023
2023

Publication Types

Select...
8
2

Relationship

0
10

Authors

Journals

citations
Cited by 38 publications
(12 citation statements)
references
References 19 publications
0
12
0
Order By: Relevance
“…In consequence, the PFS approach becomes constructive for systems with more than three machines [24]. This analysis is being refined by newer results (Tab.…”
Section: Permutation and Non-permutation Complexity: Special Casesmentioning
confidence: 99%
“…In consequence, the PFS approach becomes constructive for systems with more than three machines [24]. This analysis is being refined by newer results (Tab.…”
Section: Permutation and Non-permutation Complexity: Special Casesmentioning
confidence: 99%
“…Lin and Chen (2015) presents a simulation optimisation approach for a hybrid flow shop scheduling problem in a real-world semiconductor back-end assembly facility. In recent years, there is study which demonstrates the value of• the simulation optimisation approach for practical applications and provides directions for future research on the stochastic hybrid flow shop scheduling problem (Cho and Jeong, 2017;Li et aI., 2015;Chamnanlor et aI., 2015). Research on the scheduling problem of semiconductor wafer fabrication and propose a new dispatching rule based on the load balance.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Traditional inventory models [1][2][3][4] and production planning models [5][6][7] involve deterministic constrained functions and/or objective functions in deterministic environments. Nevertheless, uncertainty is nearly universal in real world.…”
Section: Introductionmentioning
confidence: 99%