A two-stage integrating optimization of production scheduling, maintenance and quality

Abstract: During the process of actual production, production scheduling, preventive maintenance and quality control have a close interaction with each other and thus need to be integrated for improving manufacturing system performance. The aim of this article is to jointly optimize the job sequence, the preventive maintenance locations, the preventive maintenance interval and decision variables of control chart such that the expected cost per unit time and penalty cost due to schedule delay are minimized. A two-stage i… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
6
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 13 publications
(6 citation statements)
references
References 35 publications
0
6
0
Order By: Relevance
“…Math Prog. ML [27] 2022 GA [28] 2021 BH, VNS [29] 2021 GA, MC [30] 2021 GA [31] 2021 GA [32] 2021 GrA [33] 2021 GA [34] 2021 CEA [35] 2021 GrA [36] 2021 GA [37] 2021 BD [38] 2021 RHA [12] 2021 MP NN [39] 2021 RL [40] 2021 RL [41] 2020 GA [42] 2020 MVO [43] 2020 TS [44] 2020 NSGA-II [45] 2020 ANSGA-III [46] 2020 MA MIP [47] 2020 GA MIP [48] 2020 BOMP [49] 2020 BB [50] 2020 RL [51] 2020 RL [52] 2020 NN [53] 2019 GA [54] 2019 OTA [55] 2019 AC [56] 2019 NSGA-II [57] 2019 BIP [58] 2019 MILP [59] 2019 MINLP [60] 2019 RL [61] 2019 RL [62] 2019 RL [10] 2018 GA [63] 2018 SA, GA [64] 2018 SA [65] 2017 NSGA-II [66] 2017 MA [67] 2017 MILP [68] 2017 RL [69] 2016 NSGA-II [70] 2016 LPT MILP…”
Section: Yearmentioning
confidence: 99%
“…Math Prog. ML [27] 2022 GA [28] 2021 BH, VNS [29] 2021 GA, MC [30] 2021 GA [31] 2021 GA [32] 2021 GrA [33] 2021 GA [34] 2021 CEA [35] 2021 GrA [36] 2021 GA [37] 2021 BD [38] 2021 RHA [12] 2021 MP NN [39] 2021 RL [40] 2021 RL [41] 2020 GA [42] 2020 MVO [43] 2020 TS [44] 2020 NSGA-II [45] 2020 ANSGA-III [46] 2020 MA MIP [47] 2020 GA MIP [48] 2020 BOMP [49] 2020 BB [50] 2020 RL [51] 2020 RL [52] 2020 NN [53] 2019 GA [54] 2019 OTA [55] 2019 AC [56] 2019 NSGA-II [57] 2019 BIP [58] 2019 MILP [59] 2019 MINLP [60] 2019 RL [61] 2019 RL [62] 2019 RL [10] 2018 GA [63] 2018 SA, GA [64] 2018 SA [65] 2017 NSGA-II [66] 2017 MA [67] 2017 MILP [68] 2017 RL [69] 2016 NSGA-II [70] 2016 LPT MILP…”
Section: Yearmentioning
confidence: 99%
“…The job shop scheduling problem (JSSP) has been extensively studied in academia and industry. [1][2][3][4] Traditionally, it is assumed that all resources in production are deterministic in JSSP. However, various random disturbances will inevitably occur in actual manufacturing, 5,6 resulting in reduced productivity and delayed deliveries, etc.…”
Section: Introductionmentioning
confidence: 99%
“…(3) An online scheduling framework is developed to form the mapping relationship between the manufacturing environment and the optimal scheduling model. (4) Comparisons between IRDRL and other methods are carried out to prove the effectiveness and improvement of the proposed approach.…”
Section: Introductionmentioning
confidence: 99%
“…Preventive maintenance (PM) can improve the conditions of the machines and consequently improve the product quality and machine reliability. [2][3][4][5] However, PM activities consume resources and interrupt normal production, which may lead to considerable costs. Therefore, for MMSs, effective PM scheduling is required to ensure high product quality and machine reliability with the lowest possible PM cost.…”
Section: Introductionmentioning
confidence: 99%