2020
DOI: 10.18280/jesa.530617
|View full text |Cite
|
Sign up to set email alerts
|

A Two-Stage Optimization Algorithm for Multi-objective Job-Shop Scheduling Problem Considering Job Transport

Abstract: This paper solves the job-shop scheduling problem (JSP) considering job transport, with the aim to minimize the maximum makespan, tardiness, and energy consumption. In the first stage, the improved fast elitist nondominated sorting genetic algorithm II (INSGA-II) was combined with N5 neighborhood structure and the local search strategy of nondominant relationship to generate new neighborhood solutions by exchanging the operations on the key paths. In the second stage, the ant colony algorithm based on reinforc… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
6
0
1

Year Published

2021
2021
2023
2023

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 8 publications
(7 citation statements)
references
References 20 publications
0
6
0
1
Order By: Relevance
“…For more results on this topic, we refer readers to [4][5][6]. In recent years, many scholars have conducted related research on the production and distribution of perishable products, namely, the integrated scheduling of production and delivery problem (ISPDP), the main research results are concentrated in the work of [7,8]. Chen [7] studied the consideration of customer time.…”
Section: Problem Statement and Preliminariesmentioning
confidence: 99%
See 1 more Smart Citation
“…For more results on this topic, we refer readers to [4][5][6]. In recent years, many scholars have conducted related research on the production and distribution of perishable products, namely, the integrated scheduling of production and delivery problem (ISPDP), the main research results are concentrated in the work of [7,8]. Chen [7] studied the consideration of customer time.…”
Section: Problem Statement and Preliminariesmentioning
confidence: 99%
“…Constraints ( 7)-( 12) are constraints in the production process; equation (7) represents the time consumed for continuous production of the same batch of products; equation (8) indicates that there is no interval production for the same batch of products; equations ( 9) and (10) indicate that the production time meets the production time window of the processing and distribution center; equation (11) indicates that vehicles can only be delivered after the current batch of products is completed; equation (12) indicates the sequence relationship of consecutive batches.…”
Section: Production-distribution Interference Management Model Of Per...mentioning
confidence: 99%
“…With the continuous development of the market economy and the advancement of science and technology, consumers expect ordered products to be delivered within a shorter cycle [ 1 7 ]. The increasingly market-centric order production method puts forward extremely strict requirements on the corporate capacity of production and timely completion [ 8 – 10 ]. To cope with the volatility of customer order demand, i.e., meet consumer requirements on the quality and completion date of ordered products, enterprises need to effectively control the ordered tasks in the manufacturing job-shop and to formulate a reasonable production plan based on customer demand for the completion period and their current manufacturing capacity [ 11 18 ].…”
Section: Introductionmentioning
confidence: 99%
“…The quantity of consignments rises as a result [9]. Very stringent requirements for the corporate capacity of production and on-time completion are put forth by the increasingly market-centric order completion technique [12,13].…”
Section: Introductionmentioning
confidence: 99%