2023
DOI: 10.3390/machines11020292
|View full text |Cite
|
Sign up to set email alerts
|

A Two-Step Approach to Scheduling a Class of Two-Stage Flow Shops in Automotive Glass Manufacturing

Abstract: Driven from real-life applications, this work aims to cope with the scheduling problem of automotive glass manufacturing systems, that is characterized as a two-stage flow-shop with small batches, inevitable setup time for different product changeover at the first stage, and un-interruption requirement at the second stage. To the best knowledge of the authors, there is no report on this topic from other research groups. Our previous study presents a method to assign all batches to each machine at the first sta… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 41 publications
0
0
0
Order By: Relevance