2022
DOI: 10.2139/ssrn.4149547
|View full text |Cite
|
Sign up to set email alerts
|

A Unit Commitment and Economic Dispatch Model of the Gb Electricity Market – Formulation and Application to Hydro Pumped Storage

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0

Year Published

2022
2022
2022
2022

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(4 citation statements)
references
References 78 publications
0
4
0
Order By: Relevance
“…The short-run impacts are studied econometrically over a period of varying fuel and CPS prices and varying plant mix and wind capacity, providing statistically highly significant estimates of the short-run impact of wind. We use an hourly unit commitment dispatch model of British electricity (described in Chyong et al, 2019) to compute the long-run impact of the CPS. Wind capacity is increased by 25%, leaving the plant mix and fuel prices constant, and varying the level of the CPS.…”
Section: The British Carbon Price Floormentioning
confidence: 99%
See 1 more Smart Citation
“…The short-run impacts are studied econometrically over a period of varying fuel and CPS prices and varying plant mix and wind capacity, providing statistically highly significant estimates of the short-run impact of wind. We use an hourly unit commitment dispatch model of British electricity (described in Chyong et al, 2019) to compute the long-run impact of the CPS. Wind capacity is increased by 25%, leaving the plant mix and fuel prices constant, and varying the level of the CPS.…”
Section: The British Carbon Price Floormentioning
confidence: 99%
“…We use our simple hourly unit commitment model of the 2015 GB power system (Chyong et al, 2019) to examine the impacts of varying wind capacity on fuel mix and hence CO 2 emissions, for three carbon prices and two levels of wind capacity. In contrast to Ofgem (2018), we do not model plant entry and exit, although the plant we simulate in 2015 is the plant listed as then present and consistent with our central carbon price (Ofgem 2018, Figure A3, p.9).…”
Section: Modelling the Long-run Carbon Savings From Windmentioning
confidence: 99%
“…When PSH participates in the electricity spot market optimization in full dispatch mode, the following changes occur in the clearing process of the electricity spot market [4,6,9,10] .…”
Section: Market Clearing Processmentioning
confidence: 99%
“…The charging efficiency of the storage system is 75% for the modelling [73] . According to the energy capacity and power of operational pumped hydro storage stations in 2016 [74] , the maximum storage power of the storage system is assumed to be one-tenth of the energy storage capacity. Inspection of the output of CCGT generation in 2018 reveals that the variation of the CCGT output between two consecutive times is always less than 15%.…”
Section: Determining Mefsmentioning
confidence: 99%