2020
DOI: 10.1016/j.retrec.2020.100815
|View full text |Cite
|
Sign up to set email alerts
|

A whole life cycle approach under uncertainty for economically justifiable ballasted railway track maintenance

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
32
0
2

Year Published

2020
2020
2024
2024

Publication Types

Select...
9
1

Relationship

0
10

Authors

Journals

citations
Cited by 39 publications
(34 citation statements)
references
References 32 publications
0
32
0
2
Order By: Relevance
“…This, in turn, would make it possible to manage the level of vulnerability or risks in the system, while considering the costs and benefits of different asset management strategies and resource allocations. Similar approaches have been successfully adopted globally for managing other transport infrastructures such as roads (Qiao, Dawson, Parry, & Flintsch, 2015) and railways (Sasidharan, Burrow, & Ghataora, 2020;Sasidharan & Torbaghan, 2020).…”
Section: Risk-informed Asset Management Of Bridge Scourmentioning
confidence: 99%
“…This, in turn, would make it possible to manage the level of vulnerability or risks in the system, while considering the costs and benefits of different asset management strategies and resource allocations. Similar approaches have been successfully adopted globally for managing other transport infrastructures such as roads (Qiao, Dawson, Parry, & Flintsch, 2015) and railways (Sasidharan, Burrow, & Ghataora, 2020;Sasidharan & Torbaghan, 2020).…”
Section: Risk-informed Asset Management Of Bridge Scourmentioning
confidence: 99%
“…As metodologias de análise em diferentes tipos de projetos têm adotado parâmetros técnicos (Pons et al, 2020), econômicos (Sasidharan et al, 2020) e ambientais (Shinde et al, 2018) para avaliação de cenários. Desta forma, os resultados permitiram suportar as decisões de modo a mensurar as relações de custo-benefício entre as diferentes perspectivas possíveis, como apresentado por Barrientos ( 2016) com a utilização de algoritmos de otimização inteligente para avaliação de projetos na construção de infraestrutura ferroviária.…”
Section: Revisão Bibliográficaunclassified
“…-In order to eliminate the initial effects of unplanned track maintenances performed, the duration between those period were not taken into consideration. As summarized by Sasidharan et al (2020), exponential (Quiroga and Schnieder 2011) and linear (Soleimanmeigouni, Ahmadi and Kumar 2018) are the two of the track deterioration models used in the literature. Using the mentioned models and according to the results obtained deterioration rates of the track before and after the renewal can be summarized at table 4.…”
Section: Evaluation Of the Track Geometry Quality With Standard Deviamentioning
confidence: 99%