AA Study on the Selection Criteria for Delivery Systems of Public Construction Projects in Local Governments

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
6
0

Year Published

2016
2016
2023
2023

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(6 citation statements)
references
References 0 publications
0
6
0
Order By: Relevance
“…A previous study derived weights for different selection criteria for project delivery methods using the analytic network process (ANP) method, and proposed a project delivery method selection model consisting of four phases: the preparation, evaluation, decision-making, and action phases [6]. Other studies include one that analyzed the characteristics of large public building projects and identified the factors affecting the project delivery system selection criteria [7], a study that proposed a link between project delivery method selection models and performance evaluation models [8], and a study that analyzed and identified the factors affecting the project delivery method selection criteria and examined the significance of each reference factor [1,9]. The project delivery method selection criteria proposed by previous studies through the analysis of such factors include quality, construction period, cost, complexity, project scale, owner's experience, innovative technologies, and uncertainty.…”
Section: Background Objectivesmentioning
confidence: 99%
See 3 more Smart Citations
“…A previous study derived weights for different selection criteria for project delivery methods using the analytic network process (ANP) method, and proposed a project delivery method selection model consisting of four phases: the preparation, evaluation, decision-making, and action phases [6]. Other studies include one that analyzed the characteristics of large public building projects and identified the factors affecting the project delivery system selection criteria [7], a study that proposed a link between project delivery method selection models and performance evaluation models [8], and a study that analyzed and identified the factors affecting the project delivery method selection criteria and examined the significance of each reference factor [1,9]. The project delivery method selection criteria proposed by previous studies through the analysis of such factors include quality, construction period, cost, complexity, project scale, owner's experience, innovative technologies, and uncertainty.…”
Section: Background Objectivesmentioning
confidence: 99%
“…New project delivery method proposal, with focus on performance Choi et al (2009) [1] This study presented selection criteria for delivery systems by business type.…”
Section: Background Objectivesmentioning
confidence: 99%
See 2 more Smart Citations
“…Korea has proposed the introduction of self-regulation as an alternative to new government regulations as a national-level task and is pursuing detailed policies related to this approach (Choi and Lee, 2009;Kim, 2022).…”
Section: Introductionmentioning
confidence: 99%