2020
DOI: 10.1061/(asce)be.1943-5592.0001643
|View full text |Cite
|
Sign up to set email alerts
|

Accelerated Bridge Construction

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
2
0
1

Year Published

2022
2022
2024
2024

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 12 publications
(3 citation statements)
references
References 20 publications
0
2
0
1
Order By: Relevance
“…[bh + (α E − 1)A s ]x c = 1 2 bh 2 + (α E − 1)A s h 0 ⇒ x c = 1 2 bh 2 +(α E −1)A s h 0 bh+(α E −1)A s (4)…”
Section: Calculation Of Flexural Strengthunclassified
See 1 more Smart Citation
“…[bh + (α E − 1)A s ]x c = 1 2 bh 2 + (α E − 1)A s h 0 ⇒ x c = 1 2 bh 2 +(α E −1)A s h 0 bh+(α E −1)A s (4)…”
Section: Calculation Of Flexural Strengthunclassified
“…The steel-concrete composite girder bridge takes full advantage of steel and concrete. Under the background of bridge industrialization, steel-concrete composite girder bridges have broad application prospects in small and medium-span spans [1]. However, the problem of low crack resistance of precast bridge deck joints has always been a key problem of durability [2].…”
Section: Introductionmentioning
confidence: 99%
“…Since the 1970s, assembled beam bridges have gained global prominence due to their inherent advantages, which include structural simplicity, constructional convenience, high industrialization, and cost-effectiveness (Azizinamini 2020; Zhang and Alam 2020). The assembly process for the superstructure of these bridges typically encompasses several key steps: the on-site erection of precast beams, the casting of crucial transverse connections like hinge joints and diaphragms, and the subsequent addition of deck pavement and accompanying accessories.…”
Section: Introductionmentioning
confidence: 99%