Conference Record of the 1991 IEEE Particle Accelerator Conference
DOI: 10.1109/pac.1991.164441
|View full text |Cite
|
Sign up to set email alerts
|

Accelerating cavity development for the Cornell B-factory, CESR-B

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
8
0

Publication Types

Select...
6
2
1

Relationship

1
8

Authors

Journals

citations
Cited by 27 publications
(8 citation statements)
references
References 1 publication
0
8
0
Order By: Relevance
“…To examine the stress distribution on the cavity structure, we adopt effective stress defined as (1) According to its definition, is invariably positive. Shown in Fig.…”
Section: Stress Distributionmentioning
confidence: 99%
See 1 more Smart Citation
“…To examine the stress distribution on the cavity structure, we adopt effective stress defined as (1) According to its definition, is invariably positive. Shown in Fig.…”
Section: Stress Distributionmentioning
confidence: 99%
“…The CESR-type SRF cavity [1] has been adopted as an accelerating cavity in Cornell Electron Storage Ring (CESR), Taiwan Light Source (TLS), Canadian Light Source (CLS), Shanghai Synchrotron Radiation Facility (SSRF), and Diamond Light Source (DLS). The KEK-type SRF cavity [2] has been operated in the High-energy Accelerator Research Organization (KEKB) and Beijing Electron Position Collider II (BECPII).…”
Section: Introductionmentioning
confidence: 99%
“…The first approximation simplifies the geometry of a single cavity as currently installed in the Cornell Electron Storage Ring, CESR. The 3D model of the 500 MHz CESR-B [6] assembly is shown in Fig. 4.…”
Section: Cesr-b Rf Cavity Assemblymentioning
confidence: 99%
“…For this project that began in 1999, TLS is the first synchrotron facility in which installation of an accelerating SRF module in the storage ring has been attempted. An SRF module of CESR type [2], developed in the Newman Laboratory of Nuclear Studies, Cornell University, USA, was chosen for this project. Two SRF modules were contracted to ACCEL as the first time to build a CESR-type SRF module by an industrial company.…”
Section: Introductionmentioning
confidence: 99%