2018
DOI: 10.1016/j.ijepes.2018.04.035
|View full text |Cite
|
Sign up to set email alerts
|

Accelerating the protection schemes through IEC 61850 protocols

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
6
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
6
3

Relationship

0
9

Authors

Journals

citations
Cited by 14 publications
(6 citation statements)
references
References 21 publications
0
6
0
Order By: Relevance
“…On the example of the structure shown in Figure 2 the interface in the SCADA-system is implemented. The elements of the structure are selected depending on the standardized levels of energy consumption [6,18].…”
Section: Digital Information Exchange Methodsmentioning
confidence: 99%
“…On the example of the structure shown in Figure 2 the interface in the SCADA-system is implemented. The elements of the structure are selected depending on the standardized levels of energy consumption [6,18].…”
Section: Digital Information Exchange Methodsmentioning
confidence: 99%
“…The fiber cable is considered as a very high data transmission rate. The acceleration facility is contributing to isolate the line instantaneously at the fault happen in the transmission line [52][53]. This facility important at the line fault near one side which the remote IED protection relay calculate the fault impedance in the zone two boundaries, which will send the trip order after 200 ms to 500 ms delay time.…”
Section: Iec 61850 For Aided Trip Schemementioning
confidence: 99%
“…During the inverse time delay, higher currents lead to shorter trip times, while lower currents lead to longer trip times. These relays receive input from the CT that is able to sample the current from the main line as well as transmitting it to the relay for analysis and operation [ 16 ].
Fig.
…”
Section: Introductionmentioning
confidence: 99%