Accuracy Comparison of Analogy-Based Software Development Effort Estimation Techniques

Abstract: Estimation by analogy is a commonly used software effort estimation technique and a suitable alternative to other conventional estimation techniques: It predicts the effort of the target project using information from former similar projects. While it is relatively easy to handle numerical attributes, dealing with categorical attributes is one of the most difficult issues for analogy-based estimation techniques. Therefore, we propose, in this paper, a novel analogy-based approach, called 2FA-kprototypes, to pr… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
42
0

Year Published

2018
2018
2021
2021

Publication Types

Select...
5

Relationship

4
1

Authors

Journals

citations
Cited by 27 publications
(42 citation statements)
references
References 37 publications
0
42
0
Order By: Relevance
“…Tables B2‐B7 of Appendix present the descriptions of their selected attributes, respectively. For the ISBSG R8 dataset, we conducted a data pre‐processing phase to select data (projects and attributes) in order to only retain data with high quality . This phase consists of two steps: Project selection: …”
Section: Design Of Empirical Evaluationmentioning
confidence: 99%
See 1 more Smart Citation
“…Tables B2‐B7 of Appendix present the descriptions of their selected attributes, respectively. For the ISBSG R8 dataset, we conducted a data pre‐processing phase to select data (projects and attributes) in order to only retain data with high quality . This phase consists of two steps: Project selection: …”
Section: Design Of Empirical Evaluationmentioning
confidence: 99%
“…The purpose of this step is to select historical projects with high quality data. Therefore, we used the following four criteria as in: Data quality rating: This field contains an ISBSG rating code of A, B, C, or D applied to the project data by the ISBSG quality reviewers. This code denotes the soundness and integrity of the data of each project.…”
Section: Design Of Empirical Evaluationmentioning
confidence: 99%
“…Several performance measures have been used in SDEE to assess the accuracy of effort prediction techniques . The performance evaluation of SDEE techniques may vary depending on which accuracy measures are used, as shown by Myrtveit et al and Mittas et al This study investigated the Borda count method in order to combine a set of accuracy criteria so as to avoid weaknesses and take advantages of each criterion.…”
Section: Performance Measures Datasets Description and Effort Estimmentioning
confidence: 99%
“…Based on the systematic mapping study of El Koutbi et al, a large number of accuracy criteria have been used to assess the performance of effort variation approaches: Magnitude of relative error (MRE)‐based measures, Equation , are the most used (63% of selected papers); mean magnitude of relative error (MMRE), Equation , and Pred(25), Equation were used in 47% and 16% of selected papers, respectively AEi=||EactiEesti italicMRE=italicAEiitalicEacti italicMMRE=1ni=0nMREi italicPred()25=100Ni=1N{10.25emitalicifMREi0.2500.25emitalicotherwise where Eact i and Eest i are the actual and estimated effort of the project P i respectively.…”
Section: Performance Measures Datasets Description and Effort Estimmentioning
confidence: 99%
See 1 more Smart Citation