Grouting and Ground Treatment 2003
DOI: 10.1061/40663(2003)16
|View full text |Cite
|
Sign up to set email alerts
|

Active Settlement Control with Compensation Grouting—Results from a Case Study

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2017
2017
2023
2023

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…Wu [28] proposed that the combined pre-support technology of a pipe roof and grouting reinforcement can effectively consolidate the in situ stress and improve the bearing capacity of the soft rock surrounding the rock, which plays a significant role in controlling settlement. Kummerer [29] reported compensation grouting to be an active method that can be divided into two stages: adjusting the intermediate soil and actual grouting, which can offset the settlement caused by tunnel excavation. Focusing on the project of Shenyang Metro Line 9 Olympic East-Olympic Center interval underpassing the existing Olympic Center Station of Line 2, Huo [30] verified the superiority of the CRD method in underpass construction via numerical simulation and simultaneously suggested deep-hole grouting reinforcement and jack-up technologies for the effective control of the settlement of existing structural floors.…”
Section: Introductionmentioning
confidence: 99%
“…Wu [28] proposed that the combined pre-support technology of a pipe roof and grouting reinforcement can effectively consolidate the in situ stress and improve the bearing capacity of the soft rock surrounding the rock, which plays a significant role in controlling settlement. Kummerer [29] reported compensation grouting to be an active method that can be divided into two stages: adjusting the intermediate soil and actual grouting, which can offset the settlement caused by tunnel excavation. Focusing on the project of Shenyang Metro Line 9 Olympic East-Olympic Center interval underpassing the existing Olympic Center Station of Line 2, Huo [30] verified the superiority of the CRD method in underpass construction via numerical simulation and simultaneously suggested deep-hole grouting reinforcement and jack-up technologies for the effective control of the settlement of existing structural floors.…”
Section: Introductionmentioning
confidence: 99%