2022
DOI: 10.3390/app122312074
|View full text |Cite
|
Sign up to set email alerts
|

Activity Characteristic of the Two Buried Faults in Zhongwei Basin along the Northeastern Margins of Tibetan Plateau, China, by Means of Shallow Seismic and Composite Drilling Section Exploration

Abstract: By using shallow seismic exploration, composite drilling section exploration and sample dating test, we have obtained precise positions, burial depths of uppermost point and activity characteristics of Hetan-Guotan buried fault and Zhenjing-Zhenbei buried fault in Zhongwei Basin. The results show that the latest active period of Hetan-Guotan buried fault is the middle-late Middle Pleistocene, and the latest active period of Zhenjing-Zhenbei buried fault is the Early and Middle Pleistocene. The two buried fault… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
2

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(3 citation statements)
references
References 16 publications
0
3
0
Order By: Relevance
“…The depth of the boreholes ranges from 90 to 129 m, with a cumulative footage of 691 m. The length of the drilling profile B-B is close to 765 m and the cumulative footage is 724 m, including 6 boreholes with depths ranging from 111 m to 129 m. From south to north, the boreholes are named ZK12, ZK11, ZK4, ZK13, ZK15 and ZK6, with spacing of 277 m, 157 m, 74 m, 137 m and 120 m. During the construction, the "folding method" was used to determine the layout of the boreholes. This method approaches the fault from sides to center, emphasizing dynamic construction and analysis [19,20]. Each column of the boreholes was completely photographed and well logged, and the coordinates and elevations of the boreholes were obtained using Global Position System Real-Time Kinematic (GPS RTK) measurements.…”
Section: Drillingmentioning
confidence: 99%
See 1 more Smart Citation
“…The depth of the boreholes ranges from 90 to 129 m, with a cumulative footage of 691 m. The length of the drilling profile B-B is close to 765 m and the cumulative footage is 724 m, including 6 boreholes with depths ranging from 111 m to 129 m. From south to north, the boreholes are named ZK12, ZK11, ZK4, ZK13, ZK15 and ZK6, with spacing of 277 m, 157 m, 74 m, 137 m and 120 m. During the construction, the "folding method" was used to determine the layout of the boreholes. This method approaches the fault from sides to center, emphasizing dynamic construction and analysis [19,20]. Each column of the boreholes was completely photographed and well logged, and the coordinates and elevations of the boreholes were obtained using Global Position System Real-Time Kinematic (GPS RTK) measurements.…”
Section: Drillingmentioning
confidence: 99%
“…the construction, the "folding method" was used to determine the layout of the boreholes. This method approaches the fault from sides to center, emphasizing dynamic construction and analysis [19,20]. Each column of the boreholes was completely photographed and well logged, and the coordinates and elevations of the boreholes were obtained using Global Position System Real-Time Kinematic (GPS RTK) measurements.…”
Section: Drillingmentioning
confidence: 99%
“…At the same time, some borehole and high-density electrical data were also collected. Among them, 25 boreholes and four high-density electrical sections were drilled in the active-fault detection project [21], one borehole was drilled in the risk-survey project, and 20 holes and 8 high-density electrical sections were drilled in the seismic-safety evaluation and seismic-microzoning project. In this work, the basin strata deposition was determined.…”
Section: Seismology and Geology Conditions Of The Zhongwei Basinmentioning
confidence: 99%