2022
DOI: 10.1002/geot.202100075
|View full text |Cite
|
Sign up to set email alerts
|

Adaptive and parameterised 3D BIM model for the tunnel tender and excavation phase

Abstract: Building information modelling (BIM) is a frequently discussed topic in tunnelling since it promises less loss of information and reduced lifetime cost of underground infrastructure. There is still some way to go as standardisation in this sector is immature, the implementation of three‐dimensional (3D) BIM models is developed for pilot cases of tunnelling only, and data transfer between software tools is a challenge. The long linear structures of tunnels make a specific approach of parameterised and adaptive … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
references
References 6 publications
0
0
0
Order By: Relevance