2018
DOI: 10.1002/qre.2299
|View full text |Cite
|
Sign up to set email alerts
|

Adaptive multivariate double sampling and variable sampling interval Hotelling's T2 charts

Abstract: In this article, two adaptive multivariate charts, which combine the double sampling (DS) and variable sampling interval (VSI) features, called the adaptive multivariate double sampling variable sampling interval T 2 (AMDSVSI T 2 ) and the adaptive multivariate double sampling variable sampling interval combined T 2 (AMDSVSIC T 2 ) charts, are proposed. The real purpose of using the proposed charts is to provide flexibility by enabling the sampling interval length of the DS T 2 chart to be varied so that the c… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
8
0

Year Published

2019
2019
2021
2021

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 12 publications
(8 citation statements)
references
References 41 publications
0
8
0
Order By: Relevance
“…The main difference between the two proposed charts is that when a second sample is taken, the AMDSVSI T 2 chart uses the information of the combined sample mean vectors while the AMDSVSIC T 2 chart uses the information of the combined T 2 statistics, in deciding about the process status. According to Khatun et al the AMDSVSI T 2 and AMDSVSIC T 2 charts outperform the DS and DS combined T 2 charts, as well as the T 2 and VSI T 2 charts, in detecting mean shifts.…”
Section: Adaptive Hotelling's T2 and Generalized Variance Control Chartsmentioning
confidence: 99%
See 3 more Smart Citations
“…The main difference between the two proposed charts is that when a second sample is taken, the AMDSVSI T 2 chart uses the information of the combined sample mean vectors while the AMDSVSIC T 2 chart uses the information of the combined T 2 statistics, in deciding about the process status. According to Khatun et al the AMDSVSI T 2 and AMDSVSIC T 2 charts outperform the DS and DS combined T 2 charts, as well as the T 2 and VSI T 2 charts, in detecting mean shifts.…”
Section: Adaptive Hotelling's T2 and Generalized Variance Control Chartsmentioning
confidence: 99%
“…He and Champ and Aparisi studied the double‐sampling charting technique in the multivariate case presenting two versions of the multivariate double sampling Hotelling's T 2 charts called the DS T 2 and DS combined T 2 charts. Khatun et al extended the approach of Carot et al into the multivariate case presenting two versions of combined multivariate DS and VSI adaptive charts. The proposed charts are called the Adaptive Multivariate Double Sampling Variable Sampling Interval T 2 (AMDSVSI T 2 ) and the Adaptive Multivariate Double Sampling Variable Sampling Interval Combined T 2 (AMDSVSIC T 2 ) charts.…”
Section: Adaptive Hotelling's T2 and Generalized Variance Control Chartsmentioning
confidence: 99%
See 2 more Smart Citations
“…Leoni and Costa 18 suggested a Shewhart control chart to monitor bivariate and trivariate mean vectors. An adaptive Hotelling T 2 control chart based on double sampling plan is introduced in other study 19 …”
Section: Introductionmentioning
confidence: 99%