Adaptive regulating reserve scheduling for the isolated power system

Abstract: SUMMARY Regulating reserve is generally deployed to support system frequency. Because the moment‐to‐moment load fluctuations require continuous frequency control, allocating the reserve for this kind should be flexible to support the function of automatic generation control. Because fast response units not only are assigned to support automatic generation control but also are utilized to deal with credible frequency events, the regulating reserve may be planned as a portion of contingency reserve for security … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2013
2013
2013
2013

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 22 publications
0
1
0
Order By: Relevance
“…A most common way to manage the randomness and uncertainty of wind generation in power system operation is to schedule conventional units to meet the forecasted load by deterministic optimization methods and handle all kinds of uncertainties by imposing additional operating reserve requirements . However, because it is difficult to predict wind generation with high accuracy, a large amount of reserve capacity is required to cover all possible realizations of uncertain wind generation.…”
Section: Introductionmentioning
confidence: 99%
“…A most common way to manage the randomness and uncertainty of wind generation in power system operation is to schedule conventional units to meet the forecasted load by deterministic optimization methods and handle all kinds of uncertainties by imposing additional operating reserve requirements . However, because it is difficult to predict wind generation with high accuracy, a large amount of reserve capacity is required to cover all possible realizations of uncertain wind generation.…”
Section: Introductionmentioning
confidence: 99%