2015
DOI: 10.1109/jsyst.2013.2265185
|View full text |Cite
|
Sign up to set email alerts
|

Advance Reservation in Distributed Multidomain Networks

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4

Citation Types

0
4
0

Year Published

2015
2015
2018
2018

Publication Types

Select...
2
2
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(4 citation statements)
references
References 27 publications
0
4
0
Order By: Relevance
“…The AR scheduling problem has been well studied in literature. While some have focused on rescheduling and multidomain reservation, others specifically take into account real‐world deployments, and Wavelength Division Multiplexing (WDM) optical networks . Nevertheless, only 2 AR algorithms support elastic reservations, and both considered fixed start time for the requests, while we consider flexible or unspecified start times.…”
Section: Related Workmentioning
confidence: 99%
“…The AR scheduling problem has been well studied in literature. While some have focused on rescheduling and multidomain reservation, others specifically take into account real‐world deployments, and Wavelength Division Multiplexing (WDM) optical networks . Nevertheless, only 2 AR algorithms support elastic reservations, and both considered fixed start time for the requests, while we consider flexible or unspecified start times.…”
Section: Related Workmentioning
confidence: 99%
“…While some have focused on rescheduling [5], [6], [7] and multi domain reservation [8], others particularly take into account real-world deployments [9], [10], [11], [12], and WDM optical networks [3]. Nevertheless, only two advance reservation algorithms [13], [14] support elastic reservation, and both consider fixed start time for the requests [3], while we consider flexible or unspecified start times.…”
Section: Related Workmentioning
confidence: 99%
“…While both approaches consider a fixed start time for the requests, all four classes for requests with specified or unspecified time and duration are supported in our work. Current research on AR scheduling mostly focuses on rescheduling [6][7][8], multi-domain reservations [9], and real-life deployments [10][11][12][13]. Nevertheless, reliability and fault tolerance properties have not been investigated.…”
Section: Related Workmentioning
confidence: 99%