2007
DOI: 10.2172/1349893
|View full text |Cite
|
Sign up to set email alerts
|

Advanced Burner Reactor 1000MWth Reference Concept

Abstract: 60439. For information about Argonne and its pioneering science and technology programs, see www.anl.gov.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

2
8
1

Year Published

2020
2020
2024
2024

Publication Types

Select...
3
3

Relationship

0
6

Authors

Journals

citations
Cited by 7 publications
(11 citation statements)
references
References 3 publications
2
8
1
Order By: Relevance
“…The negative worth reduces between Case 2 and Case 1 because as the sodium density is increased in the upper structures, the leakage from the reactor is reduced (thus a positive feedback). The combined effect from the sodium density change in Case 1 and 2 is still negative and is consistent with the positive sodium density coefficient reported in [2] and in Section 4.2.2. Moving to Case 3, There is a subtle point for the sodium inside the plenum above the fuel.…”
Section: Reactivity Change From Hfp To Hzpsupporting
confidence: 88%
See 2 more Smart Citations
“…The negative worth reduces between Case 2 and Case 1 because as the sodium density is increased in the upper structures, the leakage from the reactor is reduced (thus a positive feedback). The combined effect from the sodium density change in Case 1 and 2 is still negative and is consistent with the positive sodium density coefficient reported in [2] and in Section 4.2.2. Moving to Case 3, There is a subtle point for the sodium inside the plenum above the fuel.…”
Section: Reactivity Change From Hfp To Hzpsupporting
confidence: 88%
“…The total primary control system worth is $19.9 while the single stuck assembly worth is $17.4. These are ~50% less than that reported in Reference [2] which was traced to a difference in the absorber composition used in the current and the original [2] model. The OpenMC results for the primary and secondary control systems are presented in Figure 5-5 and Figure 5-6.…”
Section: Control System Worthcontrasting
confidence: 56%
See 1 more Smart Citation
“…As a default, these are set to be calculated based on pin geometry parameters, as shown below. This assembly is the metallic driver fuel assembly designed for the ABR-1000 reactor [42]. The input takes on the default correlations and Nusselt number correlation parameters and omits the pressure drop calculation in the low-fidelity model region.…”
Section: Fuel Pin Temperature Modelmentioning
confidence: 99%
“…The Advanced Fuel Cycle Facility was envisioned as a multipurpose R&D facility and was explicitly intended to include electrochemical reprocessing demonstration capabilities on the scale of 1 MTIHM/y. It was designed to process a fraction of the fuel discharged from the conceptual Advanced Burner Reactor (with a reference design of plutonium-based metallic fuel), with the remainder processed using aqueous-based technology (Cahalan et al 2007). The design effort was discontinued upon Global Nuclear Energy Partnership cancellation by the US DOE in 2009.…”
Section: Advanced Burner Reactor/advanced Fuel Cycle Facilitymentioning
confidence: 99%