2022
DOI: 10.1109/access.2022.3208966
|View full text |Cite
|
Sign up to set email alerts
|

AEHO: Apriori-Based Optimized Model for Building Construction to Time-Cost Tradeoff Modeling

Abstract: The operations involved in building a structure interact and depend on one another. The model is developed using an Apriori-based swarm intelligence method, with the non-dominated solutions to the separation of elephant herding optimization technique as the swarm intelligence method. Also, population initialization, selection, and fitness evaluation for input parameters are used. This strategy optimizes construction time, cost, & environmental effects in an actual construction project. Compared to the original… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 31 publications
0
1
0
Order By: Relevance
“…Ze et al employed the gray wolf optimization algorithm to provide insights into the issue [26]. In the practical construction process, heuristic methods have been extensively applied to the scheduling optimization of repetitive construction projects, in which the application of GAs is particularly significant [27][28][29].…”
Section: Scheduling Optimization For Repetitive Construction Projectsmentioning
confidence: 99%
“…Ze et al employed the gray wolf optimization algorithm to provide insights into the issue [26]. In the practical construction process, heuristic methods have been extensively applied to the scheduling optimization of repetitive construction projects, in which the application of GAs is particularly significant [27][28][29].…”
Section: Scheduling Optimization For Repetitive Construction Projectsmentioning
confidence: 99%