2011
DOI: 10.1080/00207543.2010.527388
|View full text |Cite
|
Sign up to set email alerts
|

Aggregate production planning for shipbuilding with variation-inventory trade-offs

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
25
0

Year Published

2014
2014
2024
2024

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 33 publications
(25 citation statements)
references
References 24 publications
0
25
0
Order By: Relevance
“…After sales forecasts and resource requirements, the various alternate production plans are generated Liu et al, 2011;Mirapour et al, 2011;Li et al, 2013). Additionally, SCA provides useful insights to problems related to operations scheduling problems, which can be formulated as mixed integer linear programming problems (Wang and Lei, 2012;.…”
Section: Productionmentioning
confidence: 99%
“…After sales forecasts and resource requirements, the various alternate production plans are generated Liu et al, 2011;Mirapour et al, 2011;Li et al, 2013). Additionally, SCA provides useful insights to problems related to operations scheduling problems, which can be formulated as mixed integer linear programming problems (Wang and Lei, 2012;.…”
Section: Productionmentioning
confidence: 99%
“…Lastly, the NSGA-II has been used to effectively solve a variety of complex optimisation problems, including those of the maritime industry. For example, this algorithm has been used to automatically generate general arrangements of complex ships (van Oers and Hopman 2010), perform aggregate production planning in shipbuilding (Liu, Chua, and Yeoh 2011), develop a decision support system for bulk material handling ports (Pratap, Nayak et al 2015), schedule joint production and maintenance (Berrichi et al 2010), solve the generation expansion planning problem (Murugan, Kannan, and Baskar 2009) and for hydro-thermal power scheduling (Deb and Karthik 2007).…”
Section: Methodsmentioning
confidence: 99%
“…This mixed strategy is typically formulated as cost-driven optimization model determining the production amounts, inventory, and human and equipment resources simultaneously (cf. Buxey (2005), Liu et al (2011), Nam and Logendran (1992)). Modeling techniques and solution methods for APP have a long tradition in academia.…”
mentioning
confidence: 96%
“…Hsieh et al(2000), for instance, propose a possibilistic linear programming model for APP. See Liu et al (2011) for a more comprehensive list of APP techniques. The issue of disaggregation, i.e.…”
mentioning
confidence: 99%
See 1 more Smart Citation