2004
DOI: 10.1287/msom.1030.0018
|View full text |Cite
|
Sign up to set email alerts
|

Airline Schedule Planning: Accomplishments and Opportunities

Abstract: P lagued by high labor costs, low profitability margins, airspace and airport congestion, high capital and operating costs, security and safety concerns, and complex and large-scale management and operations decisions, the airline industry has armed its planners with sophisticated optimization tools to improve decision making and increase airline profits. In this paper, we describe optimization approaches for airline schedule planning, demonstrating how optimization can facilitate the management of a diverse a… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

1
41
0

Year Published

2011
2011
2024
2024

Publication Types

Select...
7
2
1

Relationship

1
9

Authors

Journals

citations
Cited by 102 publications
(42 citation statements)
references
References 51 publications
1
41
0
Order By: Relevance
“…Unlike most of the studies mentioned above, which focus on specific airports and shorter time periods, our model uses data on all the domestic flights by all major airlines flown in the United States during 2005 through 2007 consisting of more than 21 million observations. This study contributes to the robust airline scheduling literature (for a review, see Ball et al 2007 andCohn 2004) by developing a stochastic model of delay propagation and using publicly available industrywide data. Researchers have conducted several studies regarding modeling flight delay propagation.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Unlike most of the studies mentioned above, which focus on specific airports and shorter time periods, our model uses data on all the domestic flights by all major airlines flown in the United States during 2005 through 2007 consisting of more than 21 million observations. This study contributes to the robust airline scheduling literature (for a review, see Ball et al 2007 andCohn 2004) by developing a stochastic model of delay propagation and using publicly available industrywide data. Researchers have conducted several studies regarding modeling flight delay propagation.…”
Section: Literature Reviewmentioning
confidence: 99%
“…In constructing each new schedule, changes are introduced to the existing schedule to reflect changes in demands and the market environment. Because of the enormous size and complexity of the problem, schedule planning is a multi-step process, usually separated into four, sequentially solved subproblems: schedule design, fleet assignment, maintenance routing, and crew scheduling (Barnhart and Cohn 2004;Barnhart and Vaze 2015).…”
Section: Schedule Planningmentioning
confidence: 99%
“…In the classic approach, the problems that occur in each step of the planning phase are separately implemented or the problems in a number of steps are integrated and solved simultaneously. Details on this approach can be found in [4], [5], and [6]. In the robust approach, the problems occurring in one or more steps of the planning phase are solved in relation to the operational phase.…”
Section: Introductionmentioning
confidence: 99%