2012
DOI: 10.1016/j.autcon.2011.12.011
|View full text |Cite
|
Sign up to set email alerts
|

Aligning building information model tools and construction management methods

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

1
129
0
5

Year Published

2013
2013
2023
2023

Publication Types

Select...
4
3
2

Relationship

0
9

Authors

Journals

citations
Cited by 208 publications
(135 citation statements)
references
References 28 publications
1
129
0
5
Order By: Relevance
“…The BIM parametric design and its visualization can be achieved. Also, virtual construction and construction schedule management of BIM is able to be practiced successfully [10]. In the study of the BIM design and construction, how to coordinate the design and construction in BIM environment were also studied.…”
Section: Significance Of the Studymentioning
confidence: 99%
“…The BIM parametric design and its visualization can be achieved. Also, virtual construction and construction schedule management of BIM is able to be practiced successfully [10]. In the study of the BIM design and construction, how to coordinate the design and construction in BIM environment were also studied.…”
Section: Significance Of the Studymentioning
confidence: 99%
“…They defined Building Information Modelling (BIM) as "a digital representation of the building process to facilitate exchange and interoperability of information in digital format" [19]. BIM can be considered as simulating a building project from the initiation stage to demolition and providing a 3D virtual environment with a workflow of integrated information through a software package [20] [21]. Integrating the deliverables in a model, BIM can predict and decrease problems and errors.…”
Section: Building Information Modellingmentioning
confidence: 99%
“…One of the main contributions of BIM to sustainable construction, which also is one of its general uses, is its direct role in economic dimension by the process of cost estimating and risk management [21]. Estimating the costs of the project and required resources can be divided into some stages to predict and calculate the costs of each phase [24].…”
Section: Economic Dimensionmentioning
confidence: 99%
“…A civil-engineering digital-model [and related BIM execution-plans and quality-assuranceprocedures put in-place instead of traditional/manual methods (Hartmann, 2012)] has potential to reduce hard-copy set-out point information, reduce road cross-section illustrations, and allow for smaller-scale simplification of longitudinal-sections' drawings (Li,2009;Li, 2012). Thus quantity of information provided in drawing-form can be reduced, but only if it is known from the outset that: native format digital versions of design drawings and models used to produce them are to be provided universally to the principal and contractors/subcontractors; and, that the parties receiving the files are capable of using information in that format (in other words, are able to use software capable of reading all supplied data).…”
Section: Quality (/Quantity) Management Drafting Timelines and Contrmentioning
confidence: 99%