ΔP — ΔQ area assessment of temporary unintentional islanding with P/f and Q/V droop controlled PV generators in distribution networks

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
4
0

Year Published

2016
2016
2023
2023

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(4 citation statements)
references
References 10 publications
0
4
0
Order By: Relevance
“…The research to solve this problem is currently underway on the output control of DG when islanding operation occurs. Several papers have applied the output control through the droop control of DG [11][12][13][14][15]. However, these controls have a slow response to prevent over-voltage, which rises rapidly due to the output control by the droop characteristic curve.…”
Section: P Lmentioning
confidence: 99%
See 1 more Smart Citation
“…The research to solve this problem is currently underway on the output control of DG when islanding operation occurs. Several papers have applied the output control through the droop control of DG [11][12][13][14][15]. However, these controls have a slow response to prevent over-voltage, which rises rapidly due to the output control by the droop characteristic curve.…”
Section: P Lmentioning
confidence: 99%
“…In this regard, the only existing studies for rapid restoration from faults are as follows: a multi-stage/multiple micro-grid technique for dividing the islanding operation section [7,8], an islanding operation method engaging the droop control of the DG when the fault section is isolated [9][10][11][12][13], a voltage control strategy that involves switching between the grid-connected mode and islanding operation mode for the VSC (Voltage-Sourced Converters) type of DGs [14], a Multi Agent System (MAS) technique for dividing switches, DGs, and load into agents for quick fault restoration [15][16][17][18][19][20], and a fault restoration method for minimizing the number of switch operations for load transfer [21]. However, these papers have focused on permanent faults and temporary faults have not been considered.…”
Section: Introductionmentioning
confidence: 99%
“…The behaviour of ES, PV inverters and protection reclosing are independent of each other. Literature [13][14][15][16][17] study in detail the risk of non-synchronous closing of circuit breaker caused by unintentional island. Different from the above references, with the help of ES, the unintentional island of the PV station which is caused by tie line fault is turned into controllable in this paper.…”
Section: Introductionmentioning
confidence: 99%
“…The main problem for passive methods is non-detection zone (NDZ) for small changes in power, voltage and frequency values and angles. Some authors analysed change of power during islanding [5,6] and general performance assessment of inverterbased photo-voltaic distributed systems [7] along with efficient energy management for PV systems [8] and maximum power point tracking in PV systems [9]. Regarding islanding operation analysis and recommendations for distribution networks, UK scenario is recommended for studying [10].…”
Section: Introductionmentioning