2021
DOI: 10.1007/s12205-021-1041-6
|View full text |Cite
|
Sign up to set email alerts
|

An Active Construction Dynamic Schedule Management Model: Using the Fuzzy Earned Value Management and BP Neural Network

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
5
0

Year Published

2022
2022
2025
2025

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 11 publications
(6 citation statements)
references
References 40 publications
0
5
0
Order By: Relevance
“…A project network diagram always begins with an event that indicates the start of the project and ends with an event that indicates the end of the project activity ( Pandiyan, et al, 2020). Each project can consist of several paths or paths from the initial event to the final even ( Dai, et al, 2020) Basically the network is a way of depicting project activities in the form of symbols ( Yu, et al, 2021).…”
Section: Critical Path Methods (Cpm)mentioning
confidence: 99%
“…A project network diagram always begins with an event that indicates the start of the project and ends with an event that indicates the end of the project activity ( Pandiyan, et al, 2020). Each project can consist of several paths or paths from the initial event to the final even ( Dai, et al, 2020) Basically the network is a way of depicting project activities in the form of symbols ( Yu, et al, 2021).…”
Section: Critical Path Methods (Cpm)mentioning
confidence: 99%
“…Earned value management is a management method that integrates scope, schedule, and resources to objectively measure project performance [ 12 , 13 ]. On the basis of work breakdown, a set of methods combining progress monitoring and cost management is established; the project schedule, progress, and cost budget are determined according to the project schedule; and the cost budget is allocated to monitor the progress of the project [ 14 ]. Due to the inconsistency between the measurement units of schedule and cost, earned value management method considers converting time scale into monetary scale according to calculation rules and adopting the same index system to measure the performance of project schedule and cost at the same time so as to solve the difficulty that schedule and cost cannot be checked synchronously [ 15 – 17 ].…”
Section: Application Basis Of Earned Value Management In Constructionmentioning
confidence: 99%
“…Water temperature must be measured in the field, and chlorophyll a must be taken back to the laboratory for testing. In order to make the input data meet the input requirements of model, centralization is performed on the input model data by using formulas ( 13)-( 17); the input model data are normalized by using formula (16); and the output model data are reversely normalized by using formula (17) [26][27][28].…”
Section: Data Sources and Preprocessingmentioning
confidence: 99%