2021
DOI: 10.1007/s11740-021-01048-0
|View full text |Cite
|
Sign up to set email alerts
|

An alternative for improving setup times and time between failures aiming at manufacturing lead time reduction

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
7
0
2

Year Published

2022
2022
2023
2023

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(9 citation statements)
references
References 36 publications
0
7
0
2
Order By: Relevance
“…Those works offer simulations to test different parameters and scenarios to improve the performance of manufacturing systems, providing better decision-making strategies (Renna, 2017;Renna & Ambrico, 2019). One of them, provides the "worst-case strategy" (regarding setup-time and time between failures), suggesting that the goal is to remove extreme events and implement solutions with ease while avoiding high costs (Utiyama et al, 2021).…”
Section: Discussion and Limitationsmentioning
confidence: 99%
“…Those works offer simulations to test different parameters and scenarios to improve the performance of manufacturing systems, providing better decision-making strategies (Renna, 2017;Renna & Ambrico, 2019). One of them, provides the "worst-case strategy" (regarding setup-time and time between failures), suggesting that the goal is to remove extreme events and implement solutions with ease while avoiding high costs (Utiyama et al, 2021).…”
Section: Discussion and Limitationsmentioning
confidence: 99%
“…Perusahaan perlu meningkatkan daya saingnya dengan meningkatkan produktivitas secara hemat biaya dan tepat waktu (Zahraee et al, 2020). Penghematan biaya dilakukan dengan menghilangkan berbagai macam pemborosan dari lini produksi dengan VSM (Mudgal et al, 2020) (Zahraee et al, 2020) (Correia et al, 2018), mempersingkat waktu setup (Utiyama et al, 2021). Perusahaan menerapkan sistem LM ke proses manufaktur untuk menghilangkan pemborosan, mengurangi lead time, meningkatkan variasi produk, dan memenuhi permintaan (Narkhede et al, 2020).…”
Section: Pendahuluanunclassified
“…Sektor industri yang menerapkan LM di dominasi sebesar 95% (37 artikel) oleh industri manufaktur ((R. Ahmad & Soberi, 2018); ; (Huang et al, 2022); (Afy-Shararah & Salonitis, 2022); (Díaz-Reza et al, 2022); (Pattanaik et al, 2019); (Greinacher et al, 2020); (Susilawati, 2021); (Utiyama et al, 2021); (Logesh & Balaji, 2021); (Leong et al, 2019); (Karasu & Salum, 2018); (N. ; (Sonmez et al, 2018); (Rossini, Audino, et al, 2019); (Narkhede et al, 2020); (Braglia et al, 2021); (Lee & Park, 2021); (Mudgal et al, 2020); (Agostinho & Baldo, 2020); (Schutzbach et al, 2022); (Malik & Bilberg, 2018); (Kafuku, 2019); (Kafuku, 2019); (Rodrigues et al, 2020); (Azevedo et al, 2019); (Correia et al, 2018); (Mohammad & Oduoza, 2019); (Mayr et al, 2018); (Brito et al, 2020); (Adlin et al, 2020); (Arey et al, 2020); (Zahraee et al, 2020); (Jituri et al, 2018); (Janeiro et al, 2020); (Martins et al, 2020); (Hartmann & Metternich, 2020)), sedangkan 5% (2 artikel) UKM ( (Kumar et al, 2018); (Wang et al, 2022) Faktor produksi 4M yang paling banyak diteliti (87% -34 artikel) yaitu faktor Method ((R. Ahmad & Soberi, 2018); ;…”
Section: Rq3: Sektor Industri Yang Mendominasi Penelitian?mentioning
confidence: 99%
“…Even though some of them include quality and maintenance aspects, this paper will be reviewed with more impact on risk management. Risk analysis (Hietikko et al, 2011;Lo et al, 2019;Macedo and Jones, 2000;Brown, 2007;Mili et al, 2008;Shah et al, 2012;Shah, 2013;Behún et al, 2014;Kremljak and Kafol, 2014;Altinisik and Hugul, 2020;Huang et al, 2020;Wu et al, 2021) Risk management (Islam and Tedford, 2012;Karkoszka, 2013;Zetterlund et al, 2016;Ratnayake and Antosz, 2017;Bastchen et al, 2018;Crespo et al, 2018;Shafqat et al, 2019;Johnson and Bogle, 2019;Gorecki et al, 2019Lamine et al, 2020Kayis et al, 2007;Bassetto et al, 2011;Bauer et al, 2014 Cube andCui et al, 2016;Thekdi and Aven, 2016;Shahtaheri et al, 2017;Tupa et al, 2017;Bevilacqua and Ciarapica, 2018;Oduoza, 2020;Stürmlinger et al, 2020;Wen et al, 2021;Utiyama et al, 2021) Performance and risk management (Thekdi and Aven, 2019) Quality control and risk management (Kawai, 2013;Bettayeb et al, 2014) Quality and risk management (Lundgren et al, 2016;…”
Section: Risk Management Overview and Tabulationmentioning
confidence: 99%
“…Wen et al, 2021 A flexible risk assessment approach integrates subjective and objective weights under uncertainty. Utiyama et al, 2021 An alternative approach to improve manufacturing setup time and the time between failures with a focus on eliminating outliers. Kawai, 2013 A system, Quality-HAZOP (Hazard and Operability Analysis) analyzes the scenarios in which manufacturing errors can affect product quality via complex propagation pathways.…”
Section: Cube and Schmitt 2014mentioning
confidence: 99%