An application of the Design Structure Matrix to Integrated Concurrent Engineering

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
28
0
1

Year Published

2011
2011
2021
2021

Publication Types

Select...
7

Relationship

2
5

Authors

Journals

citations
Cited by 40 publications
(29 citation statements)
references
References 11 publications
0
28
0
1
Order By: Relevance
“…Specifically, two modifications were made to the team‐based DSM presented by Avnet and Weigel []. First, the disciplines were reordered alphabetically to avoid confusion with the results of different analyses that were presented in the previous study.…”
mentioning
confidence: 99%
“…Specifically, two modifications were made to the team‐based DSM presented by Avnet and Weigel []. First, the disciplines were reordered alphabetically to avoid confusion with the results of different analyses that were presented in the previous study.…”
mentioning
confidence: 99%
“…Avnet and Weigel [21] provided application of the DSM in integrated concurrent engineering and modeled the full end-to-end space mission design process. To the authors' knowledge, no one has used the DSM method in the healthcare industry specifically for the development of wheelchairs.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Adopting different p k 1 , p k 2 and p k 3 , TccðMÞ was computed in four types of conditions: À two project was independent, each project as a cluster con 1 ,`two project was independent, clustering without regarding the relationships between two projects con 2 ,´clustering based on the extended DSM model, without regarding project priorities con 3 ,ˆclustering based on the extended DSM model, with regarding project priorities con 4 , computation results as shown in Table 1.…”
Section: Examplementioning
confidence: 99%
“…DSM is a matrix representation of a directed graph, which allows the project or engineering manager to represent important task relationships in order to determine a sensible sequence for the tasks being modeled [7,8]. As compared to Critical Path Method (CPM) and Program Evaluation and Review Technique(PERT), DSM is more suitable for planning information flow in PD project [9][10][11]. The rows and columns of DSM correspond to the tasks, and the matrix reveals the inputs and outputs of tasks, by manipulating the matrix, the feedback marks can be eliminated or reduced, this process is called partitioning [12,13].…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation