Geothermal Energy 2022
DOI: 10.5772/intechopen.96314
|View full text |Cite
|
Sign up to set email alerts
|

An Approach for Estimating Geothermal Reservoir Productivity under Access Limitations Associated with Snowy and Mountainous Prospects

Abstract: This chapter describes an approach to estimate reservoir productivity during the active exploration and development of a geothermal prospect. This approach allows a reservoir model to be updated by overcoming the severe time limitations associated with accessing sites for drilling and well testing under snowy and mountainous conditions. Performed in parallel with the conventional standard approach, the new approach enables us to obtain a first estimate of the reservoir productivity at an early time and to make… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 12 publications
0
1
0
Order By: Relevance
“…Therefore, to assess the well productivity, several parameters such as morphology and temperature of the ground, geothermal gradient, porosity, permeability, fluid salinity, thermal conductivity, and specific heat capacity at various depths play a critical role [12]. However, all this information often is not accessible [13] and also continuous or periodically monitoring the equipped test boreholes with temperature sensors is a time-consuming and costly procedure [4]. This is the reason why the geoengineering characteristics depend on the scale of the project are often approximated with different techniques and computer modelling approaches [14][15][16][17].…”
Section: Introductionmentioning
confidence: 99%
“…Therefore, to assess the well productivity, several parameters such as morphology and temperature of the ground, geothermal gradient, porosity, permeability, fluid salinity, thermal conductivity, and specific heat capacity at various depths play a critical role [12]. However, all this information often is not accessible [13] and also continuous or periodically monitoring the equipped test boreholes with temperature sensors is a time-consuming and costly procedure [4]. This is the reason why the geoengineering characteristics depend on the scale of the project are often approximated with different techniques and computer modelling approaches [14][15][16][17].…”
Section: Introductionmentioning
confidence: 99%