2018
DOI: 10.3390/su10082613
|View full text |Cite
|
Sign up to set email alerts
|

An E-Commerce Platform for Industrialized Construction Procurement Based on BIM and Linked Data

Abstract: Industrialized construction has raised the requirements of procurement methods used in the construction industry. The rapid development of e-commerce offers efficient and effective solutions, however the large number of participants in the construction industry means that the data involved are complex, and problems arise related to volume, heterogeneity, and fragmentation. Thus, the sector lags behind others in the adoption of e-commerce. In particular, data integration has become a barrier preventing further … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
6
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 18 publications
(6 citation statements)
references
References 60 publications
0
6
0
Order By: Relevance
“…Participation is included in the varied scope of industrial manufacturing, from factory assemblies to comprehensive lifecycle process assessments. Studies have usually served customers with platform requirements, such as within construction industry (He et al, 2018).…”
Section: Global Journal Of Research In Engineering ( G ) XXIII Issue ...mentioning
confidence: 99%
“…Participation is included in the varied scope of industrial manufacturing, from factory assemblies to comprehensive lifecycle process assessments. Studies have usually served customers with platform requirements, such as within construction industry (He et al, 2018).…”
Section: Global Journal Of Research In Engineering ( G ) XXIII Issue ...mentioning
confidence: 99%
“…IFCOI in the construction phase is mainly applied to monitor and manage quality, schedule, cost (mainly for quantity extraction [66,70]), and safety. Table 7 shows some examples of IFCOI applications during the construction phase.…”
Section: Construction Phasementioning
confidence: 99%
“…Monitoring and management of quality, schedule, cost, and safety IFC data; construction specification; on-site records [26,57,70,73,81,85,89,95,112,133,135,[158][159][160] Operation and maintenance phase Building energy management, culture heritage maintenance, defect detection, etc.…”
Section: Preconstruction Phasementioning
confidence: 99%
“…In AEC contexts, linked data and graph-based technologies can boost digitalization and knowledge creation [ 40 ], and a few studies have explored these potentials. Research efforts have developed semantic web- and graph-based applications to improve processes in quality management and defect prevention [ 16 ], construction procurement [ 41 ], asset management [ 42 ], building energy performance management [ 43 ], knowledge management [ 44 ], and look-ahead planning [ 45 ]. While linked data have been used to improve interoperability and link across domains in AEC research [ 46 ], scholarly efforts have barely delved into the potentials for construction safety information sharing.…”
Section: Literature Reviewmentioning
confidence: 99%