2015
DOI: 10.1109/tase.2014.2332511
|View full text |Cite
|
Sign up to set email alerts
|

An Effective Subgradient Method for Scheduling a Steelmaking-Continuous Casting Process

Abstract: The steelmaking-continuous-casting (SCC) process, which includes steelmaking, refining and continuous casting, is one of the major bottlenecks of iron and steel production. Efficient and effective scheduling of this process is essential to improve the productivity and reduce the production costs of the entire production system. We present a time-index formulation for this scheduling problem and a Lagrangian relaxation (LR) approach based on the relaxation of the machine capacity constraints. The relaxed proble… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
11
0

Year Published

2016
2016
2022
2022

Publication Types

Select...
8

Relationship

1
7

Authors

Journals

citations
Cited by 33 publications
(11 citation statements)
references
References 35 publications
0
11
0
Order By: Relevance
“…The enhanced strategies improve not only the practicality of the LR approach but also the exactness of evaluation of the quality of the solution, and these strategies can instruct the production of SCC schedule effectively. The global convergence of the proposed algorithm can be proved by means of the previously reported methods [10,19,21] and the characterization of the deflected-conditional subgradient.…”
Section: 3mentioning
confidence: 96%
See 2 more Smart Citations
“…The enhanced strategies improve not only the practicality of the LR approach but also the exactness of evaluation of the quality of the solution, and these strategies can instruct the production of SCC schedule effectively. The global convergence of the proposed algorithm can be proved by means of the previously reported methods [10,19,21] and the characterization of the deflected-conditional subgradient.…”
Section: 3mentioning
confidence: 96%
“…Finally, in order to avoid the confliction of the decoupled constraints, a feasible solution is obtained from the relaxed solution by the use of the different heuristic-based algorithm. The combination of SG or SSG with FDP or BDP under the LR frame has been used in different SCC scheduling problem, such as static scheduling problems [7,15,16,22,23] or dynamic scheduling problems with different objectives and under different conditions [19,31,37]. As for the rescheduling problems with LR algorithm, Xiong et al [36] proposed a dynamic scheduling algorithm with constant processing times in the rescheduling problems without considering the processing time and the other disturbance factors.…”
Section: (Communicated By Adil Bagirov)mentioning
confidence: 99%
See 1 more Smart Citation
“…HE iron and steel industry is a major backbone of many fundamental production processes worldwide. It provides the basic raw materials for civil infrastructure, such as that for construction, machinery, automobiles, shipbuilding, railroads, and for other modern manufacturing industries [1][2][3][4]. Usually, iron and steel production processes consist of ironmaking, steelmaking-continuous casting, hot rolling, and cold rolling.…”
Section: Introductionmentioning
confidence: 99%
“…Thus, welding scheduling problem (WSP) plays an important role in promoting an enterprise to be a manufacturing giant. However, studies on the WSP are relatively scarce in comparison with other real-world scheduling problems such as steelmaking scheduling issues [2][3][4][5][6][7][8][9] . The main reasons for few researches on the real-world WSP may be the following aspects.…”
Section: Introductionmentioning
confidence: 99%