2020
DOI: 10.1109/access.2020.3020314
|View full text |Cite
|
Sign up to set email alerts
|

An Efficient and Time-Saving Reliability Analysis Strategy for Complex Mechanical Structure

Abstract: With the development of production technology, the mechanical structure has become more and more complicated, which makes the simulation process of the corresponding computer model very time-consuming. As a result, the reliability analysis needs to consume huge time resources. To deal with this problem, an improved method, which balances the accuracy of failure probability and the efficiency of computation, is proposed. The novelty of the proposed method is the use of an efficient point selection strategy, the… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2021
2021

Publication Types

Select...
1

Relationship

1
0

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 37 publications
0
1
0
Order By: Relevance
“…Time-independent reliability analysis has been extensively studied. Various methods, including first and second order reliability methods (FORM & SORM) [2], random simulation methods [3,4], surrogate model-based methods [5][6][7], etc., have been developed during the past decades. FORM and SORM are quite efficient, but they may provide inaccurate results when performance functions are highly nonlinear.…”
Section: Introductionmentioning
confidence: 99%
“…Time-independent reliability analysis has been extensively studied. Various methods, including first and second order reliability methods (FORM & SORM) [2], random simulation methods [3,4], surrogate model-based methods [5][6][7], etc., have been developed during the past decades. FORM and SORM are quite efficient, but they may provide inaccurate results when performance functions are highly nonlinear.…”
Section: Introductionmentioning
confidence: 99%