SPE Annual Technical Conference and Exhibition 1980
DOI: 10.2118/9324-ms
|View full text |Cite
|
Sign up to set email alerts
|

An Empirical Correlation to Predict Diamond Bit Drilling Rates

Abstract: Diamond bit drilling tests have been performed at the Drilling Research Laboratory (DRL) in Salt Lake City, Utah. These tests were sponsored and supervised by the Shell Development Company. The tests simulated down hole drilling pressures on a typical diamond drill bit and oilfield formation. Variations of typical field operating variables were tested for penetration rate response. An empirical equation has penetration rate response. An empirical equation has been derived from the test results to predict diamo… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

1983
1983
2021
2021

Publication Types

Select...
4
2

Relationship

0
6

Authors

Journals

citations
Cited by 9 publications
(3 citation statements)
references
References 1 publication
0
3
0
Order By: Relevance
“…Several ROP correlations have been proposed in the literature throughout the history of ROP management. Firstly, Duklet and Bates (1980)…”
Section: Empirical Correlations Developed For Rop Predictionmentioning
confidence: 99%
See 1 more Smart Citation
“…Several ROP correlations have been proposed in the literature throughout the history of ROP management. Firstly, Duklet and Bates (1980)…”
Section: Empirical Correlations Developed For Rop Predictionmentioning
confidence: 99%
“…Besides of the studies which have used the analytical and semi-analytical ROP models for the purpose of ROP management, lots of studies used their own ROP models for ROP management to test their applications (Galle and Woods, 1963;Eckel, 1967;Bourgoyne and Young, 1974;Peterson, 1976;Duklet and Bates, 1980;Warren, 1981Warren, , 1987Chia and Smith, 1986;Walker et al, 1986;Winters et al, 1987;Wojtanowicz and Kuru, 1987;Maidla and Ohara, 1991;Hareland and Hoberock, 1993;Hareland and Rampersad, 1994;Caicedo et al, 2005;Hareland and Nygaard, 2007;Osgouei andÖzbayoǧlu, 2007;Shirkavand et al, 2009;Hareland et al, 2010;Motahhari et al, 2010;Seifabad and Ehteshami, 2013;Kerkar et al, 2014;Bezminabadi et al, 2017;Wiktorski et al, 2017;Al-AbdulJabbar et al, 2019;Elkatatny, 2019;Al-AbdulJabbar et al, 2020;Etesami et al, 2021). Table 6 shows a brief review on research studies which have used different ROP models and empirical correlations as the main approach for ROP management.…”
Section: Almentioning
confidence: 99%
“…Due to lack of access to database in these studies, often less attention have been paid to the rock properties. Studies indicated that among the operational parameters, weight on bit, rotational speed, bit wear, wellbore depth, mud weight and flow rate were crucial parameters (Bielstein, 1950;Cunningham and Eenink, 1959;Duklet & Bates, 1980;Paiaman et al, 2009). In this line, it was found that ROP increased with increasing weight on bit, rotational speed and mud flow rate.…”
Section: Introductionmentioning
confidence: 99%