“…Table 3 gives the optimal data path for the eight flows obtained using the DQN-EER algorithm, along with the activated switches and links (which include the links of control paths). The number of all activated switches is 17, including switches (0, 1,2,4,6,7,8,9,11,12,13,14,15,16,17,18,19), and the number of all active links in green is 18, including links (0, 1,3,5,8,9,12,14,15,16,18,20,21,24,25,26,30,31), except the two links which are used to directly connect the switches and controllers and the two links between the controllers with the overall controller 0. And the link 21 is the added one when calculating the control path.…”