2022
DOI: 10.1016/j.enbuild.2022.112114
|View full text |Cite
|
Sign up to set email alerts
|

An experimental method for building energy need evaluation at real operative conditions. A case study validation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
8
0

Year Published

2023
2023
2025
2025

Publication Types

Select...
5
1
1

Relationship

0
7

Authors

Journals

citations
Cited by 9 publications
(8 citation statements)
references
References 23 publications
0
8
0
Order By: Relevance
“…The monitoring system, designed for a decade-long integration into living spaces, employed common commercial transducers for air temperature (T in [ • C]) and relative humidity (RH in [%]) measurements on internal walls. Additionally, a dozen flux tiles developed at the University of Florence were installed on outer walls facing southwest [30]. These tiles directly measured transient heat flux (q m [W/m 2 ]), considering external parameter fluctuations and the thermophysical properties of building materials.…”
Section: Validation Of the Correlation Through An Experimental Monito...mentioning
confidence: 99%
See 3 more Smart Citations
“…The monitoring system, designed for a decade-long integration into living spaces, employed common commercial transducers for air temperature (T in [ • C]) and relative humidity (RH in [%]) measurements on internal walls. Additionally, a dozen flux tiles developed at the University of Florence were installed on outer walls facing southwest [30]. These tiles directly measured transient heat flux (q m [W/m 2 ]), considering external parameter fluctuations and the thermophysical properties of building materials.…”
Section: Validation Of the Correlation Through An Experimental Monito...mentioning
confidence: 99%
“…The relative measurement error for this device is 3.5% and the thermal resistance R t is 0.001 (m 2 • C)/W, with an active area of 0.45 × 0.45 m 2 . The installation collected signals through shielded cables running within special ducts under the plaster, reaching the fifth floor, where a commercial analogue data logger is located [30].…”
Section: Validation Of the Correlation Through An Experimental Monito...mentioning
confidence: 99%
See 2 more Smart Citations
“…Findings of this kind reinforce the need to adopt construction approaches that balance the energy demand and production. In this way, buildings under transient conditions are also addressed in the literature, as seen in the research by Balocco, Pierucci and De Lucia [77], in which energy performance is evaluated using an experimental method that monitors real-time experimental data related to internal and external microclimates and the flow of heat through structures. Studies on this subject offer significant insights into understanding thermal exchanges and improving energy management strategies.…”
Section: Ieq and Sustainability Integrationmentioning
confidence: 99%