“…Previous studies on SDM under uncertainty (Barron and Erev, 2003;Erev and Barron, 2005) and those on SDM under risk (Fujikawa, 2005(Fujikawa, , 2006 conducted laboratory experiments, employing three choice problems: Problem 1: (4, 0.8) or (3, 1); Problem 2: (4, 0.2) or (3, 0.25); Problem 3: (32, 0.1) or (3, 1). Here, let (V , p) be an option that yields an outcome of V points with probability p and zero point with probability (1-p).…”