2018
DOI: 10.1109/tpwrs.2017.2695963
|View full text |Cite
|
Sign up to set email alerts
|

An Extended IEEE 118-Bus Test System With High Renewable Penetration

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
83
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
5
3

Relationship

0
8

Authors

Journals

citations
Cited by 188 publications
(83 citation statements)
references
References 15 publications
0
83
0
Order By: Relevance
“…An illustrative example built on that described in [10] is first analyzed. The second case study is based on a modified version of the extended IEEE 118-bus system [27]. Finally, a benchmark based on the Polish 2383-bus system [28] is examined.…”
Section: Numerical Resultsmentioning
confidence: 99%
See 1 more Smart Citation
“…An illustrative example built on that described in [10] is first analyzed. The second case study is based on a modified version of the extended IEEE 118-bus system [27]. Finally, a benchmark based on the Polish 2383-bus system [28] is examined.…”
Section: Numerical Resultsmentioning
confidence: 99%
“…Increase the iteration counter ν ← ν + 1. 5) Solution of problem (26)- (27). Solve problem (26)- (27) for given d (ν−1) and η (ν−1) through the equivalent analytical expression (28).…”
Section: ) Update Of the Iteration Counter Of The Inner Loopmentioning
confidence: 99%
“…In order to prove the improvement degree of the NSGA-II algorithm on network optimization results of different node systems, the IEEE 33-, 69-and 118-bus systems are introduced. The parameters of the IEEE 69-and 118-bus systems are described in References [33,34]. Table 4 shows the optimization results of the INSGA-II algorithm on three examples.…”
Section: Case Analyses Of Ieee 33- 69- and 118-bus Systemsmentioning
confidence: 99%
“…To this end, this section optimizes the configuration scheme to consider the DG annual output change and load change trend and the revised IEEE 33-bus system-related data reference [34]. The data was recorded every hour, so it is assumed that the DG output is equal every hour and that the load demand is constant.…”
Section: Experiments On Load and Dg Output Considering Annual Time Sementioning
confidence: 99%
“…The proposed indices are applied to the IEEE 118-bus test system to demonstrate the performance of indices in large-scale systems. This test system has been used in many well-known publications in the field of power system operation and planning [38][39][40][41]. The remainder of this paper is organized as follows.…”
mentioning
confidence: 99%