2020
DOI: 10.1002/2050-7038.12600
|View full text |Cite
|
Sign up to set email alerts
|

An info‐gap risk‐averse optimization model for coordination of overcurrent protective relays considering power system uncertainty

Abstract: Summary The power system protection scheme must detect faults as soon as possible and isolate the faulty section from the rest of the network in the shortest possible time. Protection in medium voltage distribution networks is usually performed through applying coordinated protective overcurrent relays. Changes in the network topology and operational parameters may cause some uncertainties, which can have deteriorative impacts on the fault current measuring by overcurrent relays, hence lead to in‐coordinated o… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
references
References 31 publications
0
0
0
Order By: Relevance