An innovative interval type-2 fuzzy approach for multi-scenario multi-project cash flow evaluation considering TODIM and critical chain with an application to energy sector

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
8
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
6
1
1

Relationship

1
7

Authors

Journals

citations
Cited by 11 publications
(8 citation statements)
references
References 56 publications
0
8
0
Order By: Relevance
“…Furthermore, future studies can regard one side of sustainability conditions. Afterward, other well-known MCDM techniques can be applied, in the related literature of MCDM [64][65][66][67][68][69], to compare with the proposed method or increase the suitability of the selected supplier.…”
Section: Discussionmentioning
confidence: 99%
“…Furthermore, future studies can regard one side of sustainability conditions. Afterward, other well-known MCDM techniques can be applied, in the related literature of MCDM [64][65][66][67][68][69], to compare with the proposed method or increase the suitability of the selected supplier.…”
Section: Discussionmentioning
confidence: 99%
“…In conventional MADM, the weights vector is given as normalized. Therefore, some authors have performed the normalization of assessed attributes' relative importance [21,38,43,51,65] by using a linear normalization procedure. In this way, the weights of attributes are described by IT2FNs.…”
Section: The Assessment In a Direct Waymentioning
confidence: 99%
“…The rank of alternatives is based on conventional MULTIMOORA combined with fuzzy algebra rules. IT2FTODIM is employed for the different problems in the treated scientific area [39,43,51,65,69]. While applying the IT2FTODIM, the normalized decision matrix can be obtained by using: (i) the procedure proposed by Chen and Lee [74] in [39,69] and (ii) the linear normalization procedure enhanced with IT2FNs [65].…”
Section: Interval Type 2 Fuzzy Multi-objective Optimization On the Ba...mentioning
confidence: 99%
“…Because of the lack or unavailability of information relevant to project manager decisions in real-world problems, input data or model parameters are often vague/fuzzy. Typically, in project scheduling problems, ambiguity is assumed to be randomness in the activity durations [17,18]. However, in some cases, the probability distribution of the activities' duration is not known for lack of statistical data.…”
Section: Introductionmentioning
confidence: 99%