2021
DOI: 10.1080/23302674.2021.1941394
|View full text |Cite
|
Sign up to set email alerts
|

An integrated approach to joint production planning and reliability-based multi-level preventive maintenance scheduling optimisation for a deteriorating system considering due-date satisfaction

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

1
10
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
8
1

Relationship

1
8

Authors

Journals

citations
Cited by 11 publications
(11 citation statements)
references
References 63 publications
1
10
0
Order By: Relevance
“…BWM is a pairwise comparison method that provides more reliable results than similar methods [24][25][26][27]. It is used to calculate the optimal weight of each indicator [28].…”
Section: Best Worst Methodsmentioning
confidence: 99%
“…BWM is a pairwise comparison method that provides more reliable results than similar methods [24][25][26][27]. It is used to calculate the optimal weight of each indicator [28].…”
Section: Best Worst Methodsmentioning
confidence: 99%
“…For instance, it is not required to establish a connection between inputs and outputs. Additionally, the units of the inputs and outputs might be somewhat dissimilar [ 14 , 23 ]. Above all, unlike many other techniques, there is no requirement for an explicit mathematical representation of the production function.…”
Section: Methodsmentioning
confidence: 99%
“…Model of a serial-parallel multistage manufacturing system's production, quality control, and preventive maintenance [37]. Each stage has many machines to achieve productivity and line balance requirements.…”
Section: Review Of Related Work On Maintainability Scheduling In the ...mentioning
confidence: 99%