Engineering Asset Management
DOI: 10.1007/978-1-84628-814-2_124
|View full text |Cite
|
Sign up to set email alerts
|

An Integrated Collaborative Approach for FM- Sydney Opera House FM Exemplar

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
6
0

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 6 publications
(6 citation statements)
references
References 1 publication
0
6
0
Order By: Relevance
“…Collaborative practice and knowledge management are connected, making the life-cycle into a feedback loop. Studies in this area include Xu et al (2014), Hungu (2013), Liu (2012), Jordani (2010, Motawa et al (2015), and Motawa and Almarshad (2013), and there have also been a number of relevant case studies (Wang et al, 2013;Ballesty, 2006;Kasprzak et al, 2013). Jordani (2010) identified the downstream use of BIM in FM during the design and construction phase.…”
Section: Collaborative Practice and Fm Knowledge Managementmentioning
confidence: 99%
“…Collaborative practice and knowledge management are connected, making the life-cycle into a feedback loop. Studies in this area include Xu et al (2014), Hungu (2013), Liu (2012), Jordani (2010, Motawa et al (2015), and Motawa and Almarshad (2013), and there have also been a number of relevant case studies (Wang et al, 2013;Ballesty, 2006;Kasprzak et al, 2013). Jordani (2010) identified the downstream use of BIM in FM during the design and construction phase.…”
Section: Collaborative Practice and Fm Knowledge Managementmentioning
confidence: 99%
“…However, the OPP can assist industry in developing a recommended work flow for the development of owner requirements. In order to improve the operations of any facility, it is important to integrate several different sources of information throughout the project lifecycle, commissioning, and performance analysis (Ballesty 2006). These information requirements need to be realized and then integrated during the early stages of a project lifecycle.…”
Section: Discussionmentioning
confidence: 99%
“…The Sydney Opera House FM Exemplar Project (Ballesty 2006 ) used BIM to link key performance indicators to support the total asset management (TAM) system for the project after construction. Additionally, the School of Cinematic Arts (SCA) at the University of Southern California (USC) may well be the first project to implement BIM throughout the full lifecycle of a project in the U.S. (Smith 2009).…”
Section: Current Industry Case Studies Of Bim To Fm Integrationmentioning
confidence: 99%
“…These tasks include providing utility and support infrastructure for service innovations, as well as describing information communication and technology (ICT) as an enabler of service innovations. Automation has been shown to perform the aforementioned roles in facility management practice [42,43]. It has been proven that the facility management sector is one of the services.…”
Section: Facility Management Automationmentioning
confidence: 99%