An integrated congestion management strategy for real-time system operation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
5
0

Year Published

2001
2001
2017
2017

Publication Types

Select...
3
2
2

Relationship

1
6

Authors

Journals

citations
Cited by 10 publications
(5 citation statements)
references
References 5 publications
0
5
0
Order By: Relevance
“…An integrated congestion management procedure [45] as shown in Figure 6.12, which incorporates the above two issues into the willingness-to-pay dispatch strategy, is briefly described .…”
Section: 4mentioning
confidence: 99%
“…An integrated congestion management procedure [45] as shown in Figure 6.12, which incorporates the above two issues into the willingness-to-pay dispatch strategy, is briefly described .…”
Section: 4mentioning
confidence: 99%
“…Fang and David [8][9][10] proposed a transmission dispatch methodology in a pool and bilateral as well as multilateral transactions model. Prioritization of electricity transactions and willingness-to-pay for minimum curtailment strategies has been investigated as a practical alternative to deal with the congestion.…”
Section: Introductionmentioning
confidence: 99%
“…The many authors have proposed various techniques to manage congestion in the network [2][3][4][5]. The market based approaches can be categorized based on locational marginal prices, price area zones, financial transmission rights, generation rescheduling, and load curtailment and are presented in [2][3][4][5][6][7][8][9][10][11][12][13][14][15].…”
Section: Introductionmentioning
confidence: 99%
“…In the present deregulated electricity market, the increasing demand of power has not only caused congestion over the existing lines but also the stability of the lines has reached to its vulnerable limits [1][2][3][4][5][6]. This problem can be assisted by building new transmission lines but that would require additional capital investment and would also result in more complex grid management.…”
Section: Introductionmentioning
confidence: 99%