2015
DOI: 10.3390/su71013522
|View full text |Cite
|
Sign up to set email alerts
|

An Integrated Decision-Making Model for the Location of a PV Solar Plant

Abstract: Due to the increasing demand for electricity, the depletion of fossil fuels and the increase in environmental consciousness, generating power from renewable energy resources has become necessary. How to select the most appropriate site is a critical and foremost decision that must be made when setting up a renewable energy plant. This research proposes a two-stage framework for evaluating the suitability of renewable energy plant site alternatives. In the first stage, a fuzzy analytic hierarchy process (FAHP) … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
34
0
1

Year Published

2016
2016
2023
2023

Publication Types

Select...
7
2
1

Relationship

0
10

Authors

Journals

citations
Cited by 78 publications
(35 citation statements)
references
References 39 publications
0
34
0
1
Order By: Relevance
“…Implementations of decision-making in risk management in renewable energy are presented in recent studies such as: [23] at work, apply analytical processing network ANP for selecting solar photovoltaic (PV) projects. Another scientific work is quoted: [24] which use experts to evaluate qualitative features, AHP is used to calculate the priorities and a case study is examined to select a photovoltaic solar plant. Sample models in risk identification can also cite [25] that manage the risk of satisfaction/customer dissatisfaction looking for its causes with an Ishikawa diagram.…”
mentioning
confidence: 99%
“…Implementations of decision-making in risk management in renewable energy are presented in recent studies such as: [23] at work, apply analytical processing network ANP for selecting solar photovoltaic (PV) projects. Another scientific work is quoted: [24] which use experts to evaluate qualitative features, AHP is used to calculate the priorities and a case study is examined to select a photovoltaic solar plant. Sample models in risk identification can also cite [25] that manage the risk of satisfaction/customer dissatisfaction looking for its causes with an Ishikawa diagram.…”
mentioning
confidence: 99%
“…Develop a novel performance evaluation method, which integrates both FAHP method and fuzzy DEA for assisting organisations to make the supplier selection decision in auto lighting OEM company by R.J.Kou [22]. A hybrid FAHP-AR-DEA to assess the efficiencies of PV solar plant site candidates by Amy H. I. Lee et al [23]. A integrated TFN-AHP-DEA approaches for renewable energy projects analyzed economic feasibility by Gan et al [24].…”
Section: Literature Reviewmentioning
confidence: 99%
“…A. Azadeh et al [13] also presented a hybrid ANN and fuzzy DEA approach to select solar power plant locations. Lee et al [14] introduced a MCDM model to select PV solar plant locations. Ali et al combined GIS and MCDM approaches to determine the best place for wind farm location [15].…”
Section: Introductionmentioning
confidence: 99%