An integrated model for assembly line re-balancing problem

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
12
0

Year Published

2018
2018
2023
2023

Publication Types

Select...
9

Relationship

0
9

Authors

Journals

citations
Cited by 23 publications
(15 citation statements)
references
References 36 publications
0
12
0
Order By: Relevance
“…Belassiria et al [6] proposed an integrated model for assembly line rebalancing problem (I-ALRP). After the occurrence of a disturbance, tasks have to be reassigned to stations according to a new cycle time that is derived from a new demand pattern.…”
Section: Related Workmentioning
confidence: 99%
“…Belassiria et al [6] proposed an integrated model for assembly line rebalancing problem (I-ALRP). After the occurrence of a disturbance, tasks have to be reassigned to stations according to a new cycle time that is derived from a new demand pattern.…”
Section: Related Workmentioning
confidence: 99%
“…A single product model is manufactured in single model ALs (Becker and Scholl, 2006). The AL was considered as single model in 75% of the works in ALRBP literature (Antoine et al, 2016;Belassiria et al, 2018;Celik et al, 2014;Çimen et al, 2022;Corominas et al, 2008;Fattahi and Samouei, 2016;Gamberini et al, 2006Gamberini et al, , 2009Li, 2017;Li and Boucher, 2017;Makssoud et al, 2013Makssoud et al, , 2015Mokhtari and Mozdgir, 2015;Otto and Scholl, 2011;Rahman, 2010;Samadhi and Sumihartati, 2016;Sancı and Azizo glu, 2017;Serin et al, 2019;Sikora et al, 2017;Yılmaz and Erol, 2005;Zha and Yu, 2014;Zhang et al, 2018aZhang et al, , 2018bZhang et al, , 2018c.…”
Section: Type Of Product MIX In the Assembly Linementioning
confidence: 99%
“…The researchers try to assign tasks among workstations as smoothly as possible. In other words, they aim for each worker to work at workstations with nearly identical station times (Belassiria et al, 2018;Çimen et al, 2022;Grangeon et al, 2011;Lai et al, 2015;Makssoud et al, 2013;Mokhtari and Mozdgir, 2015;Zhang et al, 2016). Finally, the last column states whether there is an additional objective.…”
Section: Objective Functionsmentioning
confidence: 99%
“…In the simplest way, the production plan is adapted accordingly by reactive scheduling (Herroelen andLeus 2004, 2005;Valledor et al 2018). Further approaches for handling disruption in production planning can be found in Belassiria et al (2018); and Yue et al (2018). But optimisation times must not be too long therefor.…”
Section: Problems and Possible Improvementsmentioning
confidence: 99%